America Imports Nearly All of It - and One Utah Mine Is Trying to Change That
Ares Strategic Mining (CSE: ARS) says the U.S. imported about 440 of 445 tons of fluorspar used in 2024, citing the U.S. Geological Survey. The company’s Lost Sheep mine in Utah is its only permitted domestic source, and it is ramping toward processing. On June 8, 2026, it filed a US$100 million SEC base shelf and applied to list on Nasdaq as “USAM.” It also has a 5-year DoD IDIQ contract with up to US$250 million potential orders.
How this was made

The 30-second read
Why it matters
The article frames Ares as the only permitted U.S. fluorspar mine and ties its ramp to policy urgency (critical mineral designation) plus government demand signals (DoD IDIQ). The immediate tradable angle is financing optionality (base shelf) and potential liquidity expansion (Nasdaq listing), balanced against pre-revenue execution and dilution risk.
Market read
For traders, the newest actionable items are the shelf registration (capital-raising capacity) and the stated production ramp stage, which together can drive sentiment and volatility in a small-cap critical-minerals name.
What to watch
DoD IDIQ is a ceiling, not guaranteed orders; commissioning delays at the Delta flotation plant could dominate the near-term risk/reward despite strategic validation.
Background
Fluorspar (fluorite) is a feedstock for hydrofluoric acid and downstream uses across refrigerants, fluoropolymers, metals processing, semiconductors, and lithium battery electrolytes; the U.S. imports nearly all consumption.
Ticker impact
Ares filed a $100M SEC base shelf and disclosed a plan to list on Nasdaq under the ticker “USAM,” supporting a domestic fluorspar production ramp.
Bias toward volatility to the upside on financing/listing headlines, with downside risk if commissioning slips or dilution expectations rise.
The article’s newest concrete facts are the shelf registration and the stated production ramp status; it also reiterates the company is still transitioning and not yet sustained commercial sales.
Market effects
Reinforces the critical-minerals reshoring trade and may lift sentiment toward other domestic fluorspar/critical-mineral developers.
Highlights Utah Spor Mountain fluorspar supply-chain build-out as a strategic industrial node.
Emphasizes import dependence (notably China) as a policy driver, potentially affecting global fluorspar pricing expectations.
Counterpoint
Shelf registration and listing steps can be largely procedural; without sustained commercial processing/sales, the market may discount the catalyst versus execution milestones.
Key entities
- companyAres Strategic Mining Inc.
Lost Sheep fluorspar mine developer in Utah; filed a $100M SEC base shelf and seeks Nasdaq listing; ramping toward acidspar/metspar production.
- governmentU.S. Department of Defense
Awarded a five-year IDIQ contract under which Ares could receive up to $250M through future orders.
- regulatorU.S. Securities and Exchange Commission
Received the company’s $100M base shelf registration filing on June 8, 2026.


