Aris Mining Corp (ARIS): Financial results for Q3 2026

Aris Mining Corp (ARIS) furnished an SEC Form 6-K — earnings release. Exhibit 99.1 NEWS RELEASE TSX & NYSE: ARIS aris-mining.com ARIS MINING REPORTS Q3 2026 RESULTS Record YTD performance, generating strong operating cash flow and funding growth as Marmato CIP commissioning advances Vancouver, Canada, November 4, 2026 – Aris Mining Corporation (Ari

Original reporting
Published Nov 4, 2026, 9:10 PM UTC
Analysis
AlphAI AI DeskAI-generated
Added to AlphAI Nov 4, 2026, 9:14 PM UTC. Informational, not investment advice.
How this was made
AlphAI summarizes source reporting and applies a structured AI analysis for relevance, timing, sentiment and ticker impact. Always verify material claims with the original publisher.
AlphAI market briefEarnings
Primary signal
$ARIS
Bullish
high confidence
Mentioned
$ARIS
Relevance
8/10
AlphAI data visualization · based on SEC EDGAR 6-K
Decision brief

The 30-second read

$ARISBullishHigh
01

Why it matters

The earnings beat and operational progress are likely to drive short‑term buying pressure, especially in gold‑focused funds.

02

Market read

Strong earnings and forward production guidance make ARIS a near‑term trade candidate in the gold mining sector.

03

What to watch

Potential delays in CIP plant commissioning or regulatory hurdles at Toroparu could temper upside.

Relevance 8/10Novelty 8/10Timing: after-hours release
AlphAI · Earnings readARIS · Q3 2026 · ended September 30, 2026

ARIS MINING REPORTS Q3 2026 RESULTS Record YTD performance, generating strong operating cash flow and funding growth as Marmato CIP commissioning advances

✓Solid quarter

Q3 delivered $287 million of gold revenue, $144 million of adjusted EBITDA and $73 million of adjusted net earnings while the company funded $144 million of capital projects. YTD production, adjusted EBITDA and adjusted earnings increased versus YTD 2025, although Q3 production, adjusted EBITDA, net earnings and free cash flow after growth and expansion capital were lower than Q2 2026.

Revenue
$287M
Segovia
265M
EPS · non-GAAP
0.35

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Q3 2026 total gold productionother69.3 koz––
YTD 2026 total gold productionother217.3 koz–up 16% from YTD 2025
Q3 2026 total gold soldother68.4 koz––
YTD 2026 total gold soldother215.3 koz––
Q3 2026 gold revenueother$287M––
Q3 2026 average realized gold priceother$4,205/oz––
Q3 2026 EBITDAnon-GAAP$131M––
YTD 2026 EBITDAnon-GAAP$475M––
Q3 2026 adjusted EBITDAnon-GAAP$144M––
YTD 2026 adjusted EBITDAnon-GAAP$535M–up 81% from YTD 2025
Adjusted EBITDA, last 12 monthsnon-GAAP$702M––
Q3 2026 net earnings attributable to owners of the companyother$66.69M––
Q3 2026 net earnings per shareother$0.32/sh––
YTD 2026 net earnings attributable to owners of the companyother$259 million or $1.25/sh––
Q3 2026 adjusted net earningsnon-GAAP$72.63M––
Q3 2026 adjusted net earnings per share – basicnon-GAAP0.35 ($/share)––
YTD 2026 adjusted earningsnon-GAAP$293 million or $1.42/sh–up 99% from YTD 2025
Adjusted earnings, last 12 monthsnon-GAAP$387 million or $1.88/sh––
Q3 2026 Segovia combined AISC per ounce soldnon-GAAP$2,174––
YTD 2026 Segovia combined AISC per ounce soldnon-GAAP$2,039––
Q3 2026 Segovia owner mining AISCnon-GAAP$1,945/oz––
YTD 2026 Segovia owner mining AISCnon-GAAP$1,729/oz––
Q3 2026 Segovia CMP AISC sales marginnon-GAAP37%––
YTD 2026 Segovia CMP AISC sales marginnon-GAAP41%––
Q3 2026 Segovia AISC marginnon-GAAP$129M––
YTD 2026 Segovia AISC marginnon-GAAP$485M––
Q3 2026 adjusted net cash provided by operating activitiesnon-GAAP93,980 ($’000)––
YTD 2026 adjusted net cash provided by operating activitiesnon-GAAP293,742 ($’000)––
Q3 2026 cash flow from operations after sustaining capital and income taxesnon-GAAP69,827 ($’000)––
YTD 2026 cash flow from operations after sustaining capital and income taxesnon-GAAP239,927 ($’000)––
Q3 2026 free cash flow after growth and expansion capitalnon-GAAP(50,751) ($’000)––
YTD 2026 free cash flow after growth and expansion capitalnon-GAAP(46,986) ($’000)––
Cash balance as of September 30, 2026other$419M––
Q3 2026 additions to mining interest, plant and equipmentother143,915 ($’000)––
Q3 2026 total sustaining capitalother23,337 ($’000)––
Q3 2026 total growth capital investmentnon-GAAP120,578 ($’000)––

Segments

SegmentRevenueq/qy/y
SegoviaQ3 production was 63.4 koz. The operation processed 208.0 thousand tonnes (kt) at an average gold grade of 9.77 g/t, versus 202.5 kt at 10.23 g/t in Q2 2026. Higher throughput supported results, while temporary explosives supply constraints affected tonnes and grades from external mining partners.265.2M––
MarmatoQ3 production was 5.8 koz. The operation processed 55.5 kt at an average gold grade of 3.68 g/t, versus 84.6 kt at 3.79 g/t in Q2 2026. Approximately four weeks of flotation plant downtime during the Cascabel 2 transition contributed to lower quarterly production.not reported––

Amounts quoted below without a unit are in thousands, as in the filing’s tables. Per-share figures are as printed.

2026 outlook

  • NoteProduction guidance of 300,000 to 350,000 ounces of gold; Aris Mining is targeting the lower end of the guidance range.
  • NoteSegovia owner-operated mining AISC full-year guidance range of $1,700 to $1,800/oz.
  • NoteSegovia CMP AISC sales margin full-year guidance range of 35% to 40%.
  • NoteMarmato CIP plant first gold is expected in December 2026.
  • NoteMarmato CIP plant is planned to ramp up to approximately 4,000 tpd by mid-2027 and to reach the full 5,000 tpd design-capacity by the end of 2027.
  • NoteToroparu PFS is targeted for completion in November 2026.
  • NoteA potential Toroparu construction decision will be assessed in early 2027.

What drove it

  • YTD gold production of 217.3 koz was up 16% from YTD 2025.
  • Q3 gold revenue was $287 million, with an average realized gold price of $4,205/oz.
  • Segovia owner-mined tonnes increased approximately 23% from Q1 to Q3.
  • The successful commissioning of the Cascabel 3 filtered tailings facility and completed flotation plant upgrades are intended to support Marmato's production ramp-up.
  • The Marmato primary ball-mill refurbishment, new regrind mill and Knelson concentrator increased existing flotation plant capacity to 1,200 tpd.
  • The new Marmato CIP plant has 5,000 tpd design-capacity and commissioning is underway.

Concerns

  • Aris Mining is targeting the lower end of its 2026 production guidance of 300,000 to 350,000 ounces of gold.
  • Marmato production was affected by approximately four weeks of flotation plant downtime associated with the Cascabel 2 transition.
  • Q3 2026 free cash flow after growth and expansion capital was (50,751) ($’000) as growth capital investment was 120,578 ($’000).
  • Q3 Segovia CMP AISC sales margin was 37%, compared with 46% in Q2 2026.
  • External mining partner production at Segovia was affected by temporary explosives supply constraints.
  • Soto Norte and Toroparu potential production remain subject to necessary permits and formal construction decisions.

What to watch

  • First gold from the Marmato CIP plant is expected in December 2026.
  • Segovia mining rates and gold production during Q4 as CMP operations improve following the resolution of explosives supply constraints.
  • Marmato CIP plant ramp-up to approximately 4,000 tpd by mid-2027 and full 5,000 tpd design-capacity by the end of 2027.
  • Release of the Toroparu PFS targeted for November 2026 and a potential construction decision in early 2027.
  • Formal consultation with local communities on the completed Soto Norte Environmental and Social Impact Assessment.
  • An updated NI 43-101 technical report for Marmato expected in the first quarter of 2027.

Balance sheet and cash flow

  • Cash balance of $419 million as of September 30, 2026.
  • Operating cash flows before taxes were 157,503 ($’000) for Q3 2026 and 541,673 ($’000) for YTD 2026.
  • Income taxes paid were (16,900) ($’000) for Q3 2026 and (156,157) ($’000) for YTD 2026.
  • Q3 2026 sustaining capital was 23,337 ($’000) and growth and expansion capital was 120,578 ($’000).
  • Q3 capital projects totaled $144 million, including $86 million at Marmato and $41 million at Segovia.

Analysis

Aris Mining reported Q3 gold production of 69.3 koz and gold revenue of $287 million, with an average realized gold price of $4,205/oz. Q3 adjusted EBITDA was $144 million and adjusted net earnings were $73 million or $0.35/share. Production and earnings were lower than Q2 2026 on the reported comparisons, when production was 73.7 koz, adjusted EBITDA was $179 million and adjusted earnings were $96 million or $0.47/sh.

The YTD performance was substantially stronger than YTD 2025. Gold production was 217.3 koz, up 16% from 186.7 koz. YTD adjusted EBITDA reached $535 million, up 81% from $296 million, while YTD adjusted earnings reached $293 million or $1.42/sh, up 99% from $147 million or $0.80/sh. The release attributes Segovia's quarterly performance to higher throughput and continued strong gold prices, while noting that lower grade versus Q2 and explosives constraints at contract mining partners affected production.

Capital allocation remains concentrated on the operating expansions. Additions to mining interest, plant and equipment were 143,915 ($’000) in Q3, comprising 23,337 ($’000) of sustaining capital and 120,578 ($’000) of growth capital investment. This resulted in free cash flow after growth and expansion capital of (50,751) ($’000) for Q3, despite 93,980 ($’000) of adjusted net cash provided by operating activities. Cash was $419 million at September 30, 2026.

Marmato is the central near-term execution milestone. Q3 production fell to 5.8 koz as the transition from Cascabel 2 required approximately four weeks of flotation plant downtime, although the company completed flotation upgrades and commissioned Cascabel 3. The new 5,000 tpd design-capacity CIP plant is in commissioning, with first gold expected in December 2026. Aris Mining continues to target the lower end of 2026 production guidance of 300,000 to 350,000 ounces of gold, while its 2027 operating ramp and the Toroparu and Soto Norte permitting and development milestones remain important to the longer-term production plan.

Management, verbatim

Aris Mining delivered another strong quarter, with cash generated from Segovia supporting our significant capital investment program during the most capital-intensive phase of the Marmato expansion, while maintaining a strong balance sheet.

Neil Woodyer, Chair and CEO

At Marmato, construction of the new carbon-in-pulp (CIP) plant is nearing completion and commissioning activities are underway, with the first gold pour expected in December 2026 following start-up of the processing and gold-recovery circuits.

Neil Woodyer, Chair and CEO

Together, the Segovia and Marmato expansions underpin our target of approximately 500,000 ounces² of annual gold production once fully ramped up.

Neil Woodyer, Chair and CEO

Not in the filing

stated, not guessed
  • Total revenue other than Q3 gold revenue of $287 million was not reported.
  • Segment revenue for Marmato was not reported.
  • Gross profit and gross margin were not reported.
  • Operating income and operating margin were not reported.
  • Diluted EPS was not reported.
  • Debt balance was not reported.
  • Dividend and share repurchase activity were not reported.
  • GAAP or IFRS tax rate was not reported.
  • Prior-year Q3 total gold production, gold sold, gold revenue, average realized gold price, and net earnings per share were not reported on the corresponding Q3 summary rows.
  • Prior guidance was not provided.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Background

Aris Mining (NYSE: ARIS) filed a Form 6‑K with its Q3 2026 earnings, detailing production, cash flow and project milestones.

Company-level read

Ticker impact

$ARISBullishHigh confidence
Context

Aris Mining reported Q3 2026 results with record adjusted EBITDA, strong cash flow and production growth, and lowered guidance targeting the lower end of its 2026 gold output range.

Expected impact

likely upside as investors price in strong cash generation and progress on the Marmato CIP plant.

Evidence & confidence

The report shows 81% YoY EBITDA growth, cash balance of $419 M and forward‑looking production milestones, which typically support a bullish reaction.

Market effects

reinforces bullish outlook for gold miners as production ramps and cash flow improves.

positive for Canadian mining sector and broader commodity markets.

supports higher gold price expectations amid strong supply growth.

Counterpoint

If gold prices soften, the capital‑intensive expansion could pressure margins.

Key entities

  • Aris Mining Corp

    Gold mining company reporting Q3 2026 results.

Every ARIS earnings report

This story covers one filing. The ticker page keeps them all: each quarter's reported metrics with year-over-year and sequential comparisons, segments, guidance, and how the numbers landed against the company's own prior outlook.

Related articles

$ARISMedAI 8/10

Aris Mining (ARIS) Q3 2026 Earnings Call Transcript

Aris Mining (ARIS) reported Q3 2026 earnings, producing 69,000 ounces of gold and generating $144 million in adjusted EBITDA. The company's trailing 12-month adjusted EBITDA exceeded $700 million, with 9-month revenue at $972 million. ARIS expects stronger production in Q4, with key milestones at Segovia and Marmato, including the first gold pour at Marmato's CIP plant in December.

$ARISHighAI 9/10

Aris Mining Corp (ARIS) (Q3 2026) Earnings Call Highlights: $700 Million EBITDA Run

Aris Mining Corp (ARIS) reported Q3 2026 revenue of $287M and adjusted EBITDA of $144M, with year-to-date revenue at $972M and adjusted EBITDA at $535M. The company expects a $30M budget overrun for Marmato 2026 construction due to FX. Q4 production is targeted at 83,000 ounces to meet annual guidance. First gold at Marmato's CIP plant is expected in December 2026, with full ramp-up by late 2027.

$ARISMed

Aris Mining Reports Q3 2026 Results

Aris Mining (TSX: ARIS; NYSE: ARIS) reported Q3 2026 results, with YTD gold production up 16% and Q3 revenue at $287M. Adjusted EBITDA rose 81% YTD. Marmato CIP plant commissioning is underway, with first gold pour expected in December 2026. Segovia production increased, and explosives supply constraints were resolved. The company targets 500,000 oz of annual gold production once expansions are complete.

$ARISMedAI 8/10

Arisinfra Solutions posts Q1FY27 earnings call audio on website

Arisinfra Solutions posted the audio recording of its Q1FY27 earnings call on its investor relations site, after filing Q1FY27 standalone and consolidated audited results with BSE and NSE under SEBI Regulation 30. For quarter ended June 30, 2026, revenue rose 37.1% to ₹2,908 million and PAT rose 292% to ₹200 million. The call was held Aug 6, 2026.

$ARISMed

Aris Mining Corp (ARIS) (Q2 2026) Earnings Call Highlights: Record Cash Flow

Aris Mining (NYSE:ARIS) Q2 2026 earnings call said production is weighted to the second half of 2026, with El Silencio ramping through Q4 to debottleneck Segovia. CFO Cameron Paterson noted Q2 is typically the heaviest cash-tax quarter. Marmato investment for 2026 is $238 million, first gold scheduled for Q4 2026, needing $76 million net funding. Management outlined a path toward ~500,000 oz annual gold via Segovia and Marmato.