Trekor Metals Ltd (TGB): Financial results for Q3 2026
Trekor Metals Ltd (TGB) furnished an SEC Form 6-K — earnings release. EXHIBIT 99.1 Trekor Announces $164 Million of Adjusted EBITDA in Third Quarter VANCOUVER, British Columbia, Nov. 04, 2026 (GLOBE NEWSWIRE) -- Trekor Metals Limited (TSX: TKO; NYSE American: TGB; LSE: TKO) ("Trekor" or the "Company") reports third quarter 2026 Adjusted EBITDA* of
Facts are quoted from the filing text and checked against it. Details that could not be matched to the text are left out.
How this was made
The 30-second read
Why it matters
The earnings beat and raised production guidance provide a fresh catalyst that could lift the stock in the next trading session.
Market read
The report delivers new, material financial data and an upward revision to copper output, likely influencing both the stock and the broader mining sector.
What to watch
Inflationary input cost pressures and potential environmental permitting delays at Yellowhead could temper growth.
Trekor Announces $164 Million of Adjusted EBITDA in Third Quarter
Third-quarter revenue, cash flow from operations, net income, Adjusted EBITDA and adjusted net income were materially higher than the prior-year quarter, while Gibraltar and Florence Copper both increased copper production and Gibraltar's 2026 production guidance was raised.
Key metrics
shortened, hover for the filing’s print| Metric | Value | q/q | y/y |
|---|---|---|---|
| Q3 2026 Revenuesother | $342.2M | – | 168,316 (Cdn$ in thousands) |
| Nine months ended September 30, 2026 Revenuesother | $909.9M | – | 480,731 (Cdn$ in thousands) |
| Q3 2026 Cash flows from operationsother | $122.1M | – | 85,653 (Cdn$ in thousands) |
| Nine months ended September 30, 2026 Cash flows from operationsother | $399.4M | – | 281,054 (Cdn$ in thousands) |
| Q3 2026 Net incomeother | $33.60M | – | 61,443 (Cdn$ in thousands) |
| Nine months ended September 30, 2026 Net incomeother | $72.67M | – | 107,199 (Cdn$ in thousands) |
| Q3 2026 Basic EPSother | 0.09 | – | 0.18 |
| Nine months ended September 30, 2026 Basic EPSother | 0.20 | – | 0.31 |
| Q3 2026 Earnings from mining operations before depletion, amortization and non-recurring itemsnon-GAAP | $170.6M | – | 103,518 (Cdn$ in thousands) |
| Nine months ended September 30, 2026 Earnings from mining operations before depletion, amortization and non-recurring itemsnon-GAAP | $439.2M | – | 312,565 (Cdn$ in thousands) |
| Q3 2026 Adjusted EBITDAnon-GAAP | $164.2M | – | 102,027 (Cdn$ in thousands) |
| Nine months ended September 30, 2026 Adjusted EBITDAnon-GAAP | $382.3M | – | 268,376 (Cdn$ in thousands) |
| Q3 2026 Adjusted net incomenon-GAAP | $54.59M | – | 49,005 (Cdn$ in thousands) |
| Nine months ended September 30, 2026 Adjusted net incomenon-GAAP | $122.6M | – | 136,995 (Cdn$ in thousands) |
| Q3 2026 Adjusted EPSnon-GAAP | $0.15 | – | 0.13 |
| Nine months ended September 30, 2026 Adjusted EPSnon-GAAP | 0.34 | – | 0.39 |
| Gibraltar Q3 2026 copper productionother | 33.9 million pounds Cu | – | 6.3 million pounds Cu |
| Gibraltar nine months ended September 30, 2026 copper productionother | 94.1 million pounds Cu | – | 26.7 million pounds Cu |
| Gibraltar Q3 2026 copper salesother | 30.4 million pounds Cu | – | 4.1 million pounds Cu |
| Gibraltar Q3 2026 total operating cost (C1)non-GAAP | $2.72 per pound | – | – |
| Florence Copper Q3 2026 copper cathode productionother | 7.0 million pounds Cu | – | – |
| Florence Copper Q3 2026 copper cathode salesother | 6.9 million pounds Cu | – | – |
| Florence Copper Q3 2026 total operating cost (C1)non-GAAP | $3.54 per pound | – | – |
| Cash balance at September 30, 2026other | $214M | – | – |
2026 outlook
- NoteGibraltar is expected to produce 115 to 120 million pounds of copper in 2026.
- NoteTotal production at Florence Copper in 2026 is expected to be 25 to 28 million pounds of copper.
- NoteIncreasing flow rates and consistent PLS grades are expected to drive production up to capacity run rates in early 2027.
- NoteThe Company expects overall TCRCs to be nominal in 2026.
- NoteMolybdenum production is expected to remain at similar levels as Gibraltar advances through the Connector pit.
- NoteThe Company has copper put options in place with a strike price of US$4.75 per pound for 27 million pounds covering the fourth quarter of 2026, and US$5.00 per pound for 45 million pounds covering the first half of 2027.
What drove it
- Revenues in the third quarter were $342 million from consolidated sales of 37.4 million pounds of copper and 358 thousand pounds of molybdenum.
- Gibraltar production was supported by higher copper grades and mill throughput.
- Gibraltar copper head grades averaged 0.28% and recoveries averaged 77%.
- Gibraltar sold 30.4 million pounds of copper at an average realized copper price of US$6.40 per pound.
- Florence Copper production increased with higher solution flow rates from the wellfield.
- Florence brought online 32 new operating wells in the third quarter.
Concerns
- Recoveries at Gibraltar were impacted by more challenging ore as mining operations began to transition out of the bottom of the Connector Pit.
- Lower grades and recoveries are expected as mining transitions back to the upper benches of the Connector Pit for the next phase of mining.
- Diesel costs increased $9.6 million and explosives costs increased $3.9 million compared to the third quarter of 2025.
- Florence wellfield development is still about three months behind the original plan set out at the start of the year.
- Higher acid prices are expected next year due to reported disruptions in global acid supply chains and geopolitical events in the Middle East.
What to watch
- Gibraltar's ability to deliver its increased 2026 production guidance of 115 to 120 million pounds of copper.
- Florence Copper wellfield expansion, drilling progress and the planned ramp-up to full production capacity in early 2027.
- Gibraltar grades and recoveries as mining shifts to the upper benches of the Connector Pit.
- Site landed diesel prices, acid supply negotiations for 2027, and treatment and refining charges.
- Progress of the Yellowhead project through the environmental assessment process.
Balance sheet and cash flow
- Cash flow from operations was $122.1 million in the third quarter.
- Cash flows from operations were 122,131 (Cdn$ in thousands) for Q3 2026 and 399,378 (Cdn$ in thousands) for the nine months ended September 30, 2026.
- At September 30, 2026, the Company had a cash balance of $214 million.
- Florence Copper wellfield development capital expenditures were 25,457 (US$ in thousands) for the three months ended September 30, 2026 and 65,007 (US$ in thousands) for the nine months ended September 30, 2026.
Analysis
Trekor reported a strong Q3 2026. Revenue was 342,222 (Cdn$ in thousands), versus 173,906 (Cdn$ in thousands) in Q3 2025, while cash flows from operations were 122,131 (Cdn$ in thousands), versus 36,478 (Cdn$ in thousands). Net income was 33,605 (Cdn$ in thousands), compared with a net loss of (27,838) (Cdn$ in thousands), and Adjusted EBITDA was 164,164 (Cdn$ in thousands), compared with 62,137 (Cdn$ in thousands). Management attributed the financial result to solid Gibraltar production and continued strength in copper prices.
Gibraltar produced 33.9 million pounds of copper in Q3, compared with 27.6 million pounds in Q3 2025, and sold 30.4 million pounds at an average realized copper price of US$6.40 per pound. Output was supported by higher grade ore and mill throughput of 7.5 million tons. Copper head grades averaged 0.28% and recoveries averaged 77%. Sales trailed production because shipment timing added 3.0 million pounds of inventory during the quarter.
Costs remain an important offset. Gibraltar total operating cost (C1) was US$2.72 per pound in Q3 2026, compared with US$2.87 per pound in Q3 2025, with the reduction attributed to higher production and higher capitalized stripping costs. However, diesel costs increased $9.6 million and explosives costs increased $3.9 million from Q3 2025. Management also expects lower grades and recoveries as mining transitions to the upper benches of the Connector Pit.
Florence Copper continued its ramp-up, producing 7.0 million pounds of copper cathode versus 5.2 million pounds in Q2 2026. Average PLS flow rate was 4,454 gpm, compared with 3,182 gpm in Q2, and operating production wells increased to 141 from 110. Florence total operating cost (C1) improved to US$3.54 per pound from US$4.72 per pound. The central execution issue is development timing: the wellfield expansion remains about three months behind the original plan, although the company expects 25 to 28 million pounds of Florence production in 2026 and full production capacity in early 2027.
The company raised Gibraltar's 2026 copper production guidance to 115 to 120 million pounds from 110 to 115 million pounds, after producing 94.1 million pounds through three quarters. It maintained Florence guidance of 25 to 28 million pounds for 2026. The $214 million cash balance and $122.1 million of quarterly operating cash flow provide reported liquidity context, while the release did not provide debt balances, free cash flow, capital-return activity, revenue guidance, or margin guidance.
Management, verbatim
Another solid production quarter at Gibraltar, and continued strength in copper prices drove excellent financial performance in the quarter. Net income and Adjusted EBITDA for the third quarter both surpassed any previous quarter in our history. We’re looking forward to continued improvement as Florence Copper ramps-up to its production capacity over the coming months.
Stuart McDonald, President & CEO of Trekor
Gibraltar’s solid performance through three quarters has been a positive catalyst and has allowed us to capitalize on a very strong copper market. We continue to see some inflationary pressure on input costs, particularly diesel and explosives which increased unit costs by approximately US$0.30 per pound compared to a year ago. Offsetting some of these higher costs are a continued strong molybdenum by-product credit and favourable treatment and refining terms, which will improve again in 2027.
Stuart McDonald, President & CEO of Trekor
We have been operating the Florence wellfield for nearly a year now and are pleased with the progress made in the production ramp-up. Wellfield drilling productivities have improved significantly in recent months. With six drill rigs now operating, we expect to complete the planned 100 wells this year, positioning us to achieve full production capacity early next year.
Stuart McDonald, President & CEO of Trekor
Not in the filing
stated, not guessed- Debt balance
- Free cash flow
- Gross profit and gross margin
- Operating income
- Operating expenses
- Diluted EPS
- Income tax rate
- Segment revenue
- Capital expenditures other than Florence Copper wellfield development capital expenditures
- Share repurchases
- Dividends
- Revenue guidance
- Gross margin guidance
- Operating expense guidance
- Tax rate guidance
- Previous-release outlook for comparison
Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.
Background
Trekor Metals Ltd (TSX: TKO, NYSE AM: TGB) filed a Form 6‑K earnings release for Q3 2026, detailing operational and financial performance.
Ticker impact
Trekor Metals reported Q3 2026 Adjusted EBITDA of $164.2M, cash flow $122.1M and raised copper production guidance to 115‑120M lbs, a material earnings release.
likely upward pressure as market prices in higher earnings and production outlook
The company posted record adjusted EBITDA, solid cash flow and increased copper output guidance, all of which are fresh, material facts that typically drive a positive price reaction.
Market effects
Higher copper production guidance may support other miners and copper‑related equities.
Positive for Canadian mining sector and broader commodity markets.
Improved copper supply outlook could influence global industrial demand sentiment.
Counterpoint
If copper prices soften, the raised guidance may not translate into earnings upside.
Key entities
- CompanyTrekor Metals Ltd
Copper and molybdenum miner reporting Q3 2026 results.
