Cadeler plc (CDLR): Financial results for Q3 2026

Cadeler plc (CDLR) furnished an SEC Form 6-K — earnings release. Third Quarter 2026 Earnings Release For the period 1 January to 30 September 2026 q Cadeler plc. Incorporated in the UK. Company Number: 16337636 Avocet Court, 8 Central Avenue, St Andrews Business Park, Norwich, England, NR7 0HR 2 ________________ Financial Performance Acquisiti

Event · Earnings
Also in this documentGuidance · reaffirm · €910M–€1B

Facts are quoted from the filing text and checked against it.

Original reporting
Published Nov 23, 2026, 11:16 AM UTC
Analysis
AlphAI AI DeskAI-generated
Added to AlphAI Nov 23, 2026, 11:21 AM UTC. Informational, not investment advice.
How this was made
AlphAI summarizes source reporting and applies a structured AI analysis for relevance, timing, sentiment and ticker impact. Always verify material claims with the original publisher.
AlphAI market briefEarnings
Primary signal
$CDLR
Neutral
medium confidence
Mentioned
$CDLR
Relevance
8/10
AlphAI data visualization · based on SEC EDGAR 6-K
Decision brief

The 30-second read

$CDLRNeutralMed
01

Why it matters

Revenue and EBITDA are up on fleet expansion and Menck, while profit and operating cash flow declined from a prior-year termination fee and higher working capital outflow. Guidance was reaffirmed.

02

Market read

Primary earnings disclosure for nine months of 2026 with full financial tables. Guidance reaffirmed. Profit and operating cash flow lower year on year.

03

What to watch

Utilisation fell to 69.8% from 75.8% as new vessels entered service, and transaction costs of EUR 7.2 million were excluded from adjusted EBITDA. Pending compulsory purchase of Cadeler A/S shares for about EUR 173 million adds cash demand.

Relevance 8/10Novelty 8/10Timing: Filed 2026-11-23, reaction at next trading session
AlphAI · Earnings readCDLR · 9M 2026 · ended 2026-09-30

Cadeler 9M 2026 revenue rises to EUR 663 million on fleet expansion and Menck acquisition, while net profit falls to EUR 143 million and full-year 2026 guidance is maintained

→Mixed quarter

Revenue, backlog and contracted days grew, and full-year 2026 guidance was maintained. Profit, EBITDA, operating cash flow and vessel utilisation were lower than the 9M 2025 comparison, which included EUR 111 million of non-recurring termination fees, and total debt and assets increased sharply after the Menck acquisition and the redomiciliation funding.

Revenue
€663M
EUR 210 million increase (as printed) y/y
Menck (acquired 11 August 2026)
approximately EUR 24.1 million (contribution from acquisition date to 30 September 2026)
EPS · GAAP
EUR 0.38
FY2026 outlook
EUR 910 million to EUR 1,000 million (maintained; includes an anticipated hammer sale scheduled to complete in December 2026)

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Revenue (9M 2026)GAAP€662.6M–EUR 210 million increase (as printed)
Cost of sales (9M 2026)GAAP−€403.7M–EUR 245 million higher (as printed)
Gross profit (9M 2026)GAAP€258.9M––
Net other operating income and expenses (9M 2026)GAAP€935K––
Administrative expenses (9M 2026)GAAP−€77.56M––
Operating profit (9M 2026)GAAP€182.3M––
Financial income (9M 2026)GAAP€11.16M––
Financial expenses (9M 2026)GAAP−€56.42M––
Net financials (9M 2026)GAAP−€45.26M––
Profit before income tax (9M 2026)GAAP€137.0M––
Income tax expense (9M 2026)GAAP€5.89M––
Profit for the period (9M 2026)GAAP€142.9M–EUR 89 million decrease (as printed)
Basic earnings per share (9M 2026)GAAPEUR 0.38 per share––
Diluted earnings per share (9M 2026)GAAPEUR 0.38 per share––
EBITDA (9M 2026)non-GAAP€320.8M–EUR 1 million decrease (as printed)
Transactional costs, Menck acquisition (9M 2026)non-GAAP€7.20M––
Adjusted EBITDA (9M 2026)non-GAAP€328.0M––
Net cash provided by operating activities (9M 2026)GAAP€169.6M–EUR 116 million lower (as printed)
Net cash used in investing activities (9M 2026)GAAP−€959.4M–EUR 14 million increase (as printed)
Investment in property, plant and equipment (9M 2026)GAAP−€453.1M––
Net cash provided by financing activities (9M 2026)GAAP€779.4M–EUR 26 million decrease (as printed)
Net increase/(decrease) in cash and cash equivalents (9M 2026)GAAP−€10.42M––
Contracted days (9M 2026)other1,960 days––
Utilisation (9M 2026)other69.8%––

Segments

SegmentRevenueq/qy/y
Menck (acquired 11 August 2026)Revenue from newly acquired business Menck, from the date of acquisition to 30 September 2026, cited in the filing as part of the revenue increase. The filing does not break revenue into other business lines or segments.approximately EUR 24.1 million (contribution from acquisition date to 30 September 2026)––

FY2026 outlook

  • RevenueEUR 910 million to EUR 1,000 million (maintained; includes an anticipated hammer sale scheduled to complete in December 2026)
  • NoteEBITDA EUR 435 million to EUR 525 million, when excluding costs related to the acquisition and integration of Menck (maintained)

Capital returns

  • No dividends or share buybacks are reported in the filing.
  • March 2026 private placement on 25 March 2026: approximately 35 million shares at NOK 56 per share, approximately EUR 175 million raised before transaction costs; net proceeds of EUR 170 million after transaction costs.
  • Proceeds from issue of share capital in the 9M 2026 cash flow statement: EUR 174,199 thousand; transactional costs on issues of shares: EUR (3,856) thousand.
  • Subsequent event: compulsory purchase by Cadeler plc of 30,648,502 Cadeler A/S shares (including 5,208 treasury shares) at NOK 58.42 per share, for an aggregate purchase price of approximately EUR 173 million, ongoing after the redomiciliation completed on 4 November 2026.
  • Redomiciliation share exchange offer accepted by 92.06% of Cadeler A/S shareholders.

What drove it

  • Company explanation for the revenue increase: principally the increase in contracted days resulting from fleet expansion, plus EUR 24 million of revenue from Menck from acquisition to 30 September 2026. Contracted days rose to 1,960 from 1,365.
  • Company explanation for the higher cost of sales: mainly the addition of three new operating vessels (Wind Ally, Wind Mover and Wind Ace) and EUR 14.3 million of Menck's cost base following the acquisition.
  • Company explanation for lower utilisation: the eleven operating vessels achieved 69.8% utilisation versus 75.8% for the eight vessels in 2025; the filing states the decrease reflects transition and transport periods associated with bringing new vessels into operation.
  • Company explanation for lower profit: largely the EUR 111 million non-recurring termination fees recognised in the prior period, and partly higher financial expenses, as most vessels were delivered as expected, so a higher portion of interest costs was expensed rather than capitalised.
  • Company explanation for lower operating cash flow: primarily a higher working capital outflow, along with a higher operating profit in the prior period, mainly related to the termination fee received in the prior period.
  • Company explanation for higher investing outflow: primarily the Menck acquisition, partly offset by lower additions to property, plant and equipment compared with the prior-year period.
  • Company explanation for lower financing inflow: primarily lower proceeds from borrowings and higher loan repayments and interest payments, partly offset by net proceeds of EUR 170 million from the March 2026 share issue.
  • EBITDA includes EUR 8.9 million from Menck. The difference between EBITDA and adjusted EBITDA is EUR 7.2 million of Menck acquisition transaction costs, none in the comparative period.
  • Operating profit fell from EUR 247,637 thousand to EUR 182,284 thousand while administrative expenses rose from EUR (50,828) thousand to EUR (77,562) thousand; the filing does not explain administrative expenses beyond the transaction costs note.

Concerns

  • Profit for the period fell by EUR 89 million, and the 9M 2025 comparison includes EUR 111 million of non-recurring termination fees.
  • Vessel utilisation fell to 69.8% from 75.8% while the operating fleet grew from eight to eleven vessels.
  • Operating cash flow fell by EUR 116 million to EUR 169,585 thousand.
  • Net financials worsened to EUR (45,256) thousand from EUR (9,713) thousand, with financial expenses at EUR (56,420) thousand.
  • Total borrowing of EUR 2,332 million, with EUR 535 million due in less than one year, and EUR 380 million drawn on the Menck bridge and up to EUR 220 million of bridge funding for the compulsory purchase.
  • Cash and cash equivalents declined to EUR 140,097 thousand from EUR 151,679 thousand at 31 December 2025.
  • Equity ratio fell to 41.3% from 44.0%; return on equity for the nine-month period is 8.5%.
  • Menck purchase price allocation and final consideration remain preliminary, with completion accounts expected in Q4 2026.

What to watch

  • Delivery and utilisation of the newly added vessels (Wind Ally, Wind Mover, Wind Ace) and the timing of Wind Apex in Q2 2027.
  • Completion of the Menck completion accounts and final purchase price in Q4 2026, and the finalised purchase price allocation within the IFRS 3 measurement period.
  • Completion of the hammer sale scheduled for December 2026, which the filing says is included in full-year revenue guidance.
  • Conversion of the backlog: the share with positive FID (76% at the release date) and the EUR 568 million of backlog subject to counterparty FID at 30 September 2026.
  • Refinancing of the EUR 535 million of debt due within one year and the replacement or repayment of the Menck and redomiciliation bridge facilities.
  • Completion of the compulsory purchase of Cadeler A/S shares for approximately EUR 173 million.
  • Full-year 2026 EBITDA against the EUR 435 million to EUR 525 million range, excluding Menck acquisition and integration costs.

Balance sheet and cash flow

  • Total assets at 30 September 2026: EUR 4,476,825 thousand, a 31% increase compared to EUR 3,416,676 thousand at 31 December 2025; the filing states Menck accounted for 19 percentage points of the 31% increase.
  • Property, plant and equipment at 30 September 2026: EUR 3,421,191 thousand; the filing cites a EUR 484 million increase in property, plant and equipment, primarily attributable to newbuilds and various vessel upgrades.
  • Intangible assets at 30 September 2026: EUR 442,110 thousand (EUR 19,432 thousand at 31 December 2025).
  • Total equity at 30 September 2026: EUR 1,850,955 thousand, an increase of EUR 347 million from EUR 1,503,676 thousand at 31 December 2025.
  • Total liabilities at 30 September 2026: EUR 2,625,870 thousand (EUR 1,913,000 thousand at 31 December 2025).
  • Cash and cash equivalents at 30 September 2026: EUR 140,097 thousand (EUR 151,679 thousand at 31 December 2025).
  • Debt to credit institutions: non-current EUR 1,755,491 thousand and current EUR 535,001 thousand at 30 September 2026 (EUR 1,494,623 thousand and EUR 116,131 thousand at 31 December 2025).
  • Debt repayment profile at 30 September 2026 (EUR million): corporate financing total 1,007; vessel financing total 1,325; total borrowing 2,332. Less than 1 year: 535 total borrowing.
  • Financing arrangements: EIFO-backed green term loan of EUR 247 million signed on 10 July 2026 to fund the delivery of Wind Apex, expected in Q2 2027; EUR 40 million increase in the 2025 unsecured HoldCo facility signed and drawn on 10 July 2026; Menck Bridge Facility Agreement of up to EUR 500 million (EUR 380 million drawn); bridge facility of up to EUR 220 million to fund the compulsory purchase.
  • Menck acquisition: enterprise valuation equivalent to EUR 501 million; purchase price transferred EUR 500,685 thousand; net cash purchase price EUR 499,904 thousand; goodwill EUR 163,452 thousand; purchase price allocation preliminary; completion accounts expected to conclude in Q4 2026.
  • Return on assets 4.6% and return on equity 8.5% for the nine-month period; the filing states the 2025 ratios (11.9% and 20.5%) are based on the twelve months ended 31 December 2025. Equity ratio 41.3% (44.0% at 31 December 2025).
  • Covenants: as of 30 September 2026 the Group was in compliance with all financial covenants and expects to remain compliant for the remainder of 2026.
  • Order backlog excluding Menck: EUR 2,275 million at 30 September 2026 (firm EUR 1,915 million). Including additions through 23 November 2026: EUR 2,415 million. 75% of backlog at 30 September 2026 (EUR 1,708 million) related to projects with positive final investment decision (FID); 76% as of the release date.

Analysis

Cadeler reported 9M 2026 revenue of EUR 662,598 thousand, up from EUR 452,785 thousand, an increase the company attributes principally to more contracted days from fleet expansion, with EUR 24 million from Menck since its acquisition on 11 August 2026. The prior-year base includes EUR 111 million of non-recurring termination fees, so the comparison is not like for like. Contracted days rose to 1,960 from 1,365, but utilisation fell to 69.8% from 75.8%, which the company links to transition and transport periods for the three newly added vessels. Cost of sales rose to EUR (403,687) thousand from EUR (158,826) thousand, which the filing ties mainly to the new vessels and EUR 14.3 million of Menck costs.

Profitability moved lower at the profit line. Operating profit was EUR 182,284 thousand against EUR 247,637 thousand, and profit for the period was EUR 142,916 thousand against EUR 232,348 thousand. The company's explanation is the absence of the prior-year termination fees and higher financial expenses as more interest was expensed rather than capitalised after vessel deliveries. Financial expenses were EUR (56,420) thousand against EUR (14,125) thousand. Basic EPS was EUR 0.38 against EUR 0.66, and diluted EPS was EUR 0.38 against EUR 0.65. EBITDA was EUR 320,818 thousand against EUR 321,568 thousand, and adjusted EBITDA, which adds EUR 7,198 thousand of Menck transaction costs, was EUR 328,016 thousand.

Cash generation weakened. Operating cash flow was EUR 169,585 thousand against EUR 285,520 thousand, which the company attributes mainly to a higher working capital outflow and the prior-year termination fee. Investing outflows were EUR (959,441) thousand, with the Menck acquisition the main driver and PP&E investment of EUR (453,132) thousand against EUR (930,126) thousand in the prior year. Financing inflows of EUR 779,434 thousand were supported by borrowings and the March 2026 share issue, which had net proceeds of EUR 170 million. Net cash decreased by EUR (10,422) thousand to EUR 140,097 thousand at period end.

The balance sheet expanded materially. Total assets reached EUR 4,476,825 thousand, up 31% from year end, with Menck accounting for 19 percentage points of that increase. Equity rose to EUR 1,850,955 thousand, and the equity ratio declined to 41.3% from 44.0%. Borrowing totals EUR 2,332 million, including EUR 535 million due within one year. The company states it was in covenant compliance at 30 September 2026. Backlog excluding Menck stood at EUR 2,275 million, rising to EUR 2,415 million including additions through 23 November 2026.

Full-year 2026 guidance is maintained, with revenue of EUR 910 million to EUR 1,000 million, including an anticipated hammer sale scheduled to complete in December 2026, and EBITDA of EUR 435 million to EUR 525 million excluding Menck acquisition and integration costs. The filing does not give a quarterly split, so the third-quarter figures cannot be isolated from the nine-month totals. The period-on-period declines in profit, EBITDA and cash flow, set against the revenue and backlog growth, are the points that deserve closest attention.

Not in the filing

stated, not guessed
  • Standalone Q3 2026 figures (three months) and the prior-quarter comparison: the release reports nine-month figures only.
  • Year-over-year percentage changes for revenue, profit, EBITDA and cash flow lines (the filing gives EUR amounts only).
  • Gross profit margin, operating margin and EBITDA margin figures: not printed.
  • Prior-year figures for gross profit, administrative expenses, financial income and expenses, net financials, PP&E investment, net change in cash and contracted days, where no change was printed.
  • Prior-guidance comparison: no previous outlook was provided, so guidance changes are not assessed.
  • Guidance on gross margin, operating expenses and tax rate: not provided.
  • Dividend policy and any dividend or buyback in the period: not reported.
  • Revenue breakdown by business line or segment beyond the Menck contribution: not reported.
  • Exact Menck revenue: the filing says approximately EUR 24.1 million and approximately EUR 0.9 million net profit; no exact figure is printed.
  • Final Menck purchase price and purchase price allocation: preliminary, completion accounts pending in Q4 2026.
  • Pro-forma revenue and earnings including Menck for the full period: stated as not practically possible to provide.
  • Ratio changes versus the prior comparable period: return on assets and equity are on different period bases (nine months versus twelve months), and no change is printed.
  • Executive quotes: none appear in the filing text.
  • Fiscal period label: the document header reads Q3 2026, while the financial statements cover the nine months ended 30 September 2026; the 9M 2026 label is used here.
  • Consensus estimates, analyst expectations and share-price reaction: not in the documents.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. Guided figures in the outlook comparison come from the company’s previous release. A figure in this read could not be matched to the filing. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Background

Cadeler plc completed redomiciliation to the UK on 4 November 2026 and acquired Menck on 11 August 2026. The company operates offshore wind installation vessels.

Company-level read

Ticker impact

$CDLRNeutralMedium confidence
Context

Nine-month 2026 revenue rose to EUR 663 million, but profit fell to EUR 143 million from EUR 232 million, and the company reaffirmed guidance.

Expected impact

Likely limited move as reaffirmed guidance offsets lower nine-month profit and operating cash flow. Direction depends on how the market weighs the Menck integration and higher financing costs.

Evidence & confidence

Revenue and vessel additions support the top line, while the EUR 111 million prior-year termination fee, higher financial expenses and a EUR 116 million drop in operating cash flow weigh on earnings. Company reaffirmed guidance, which limits the downside signal.

Market effects

Offshore wind installation vessel operators may see read-across on utilisation and transition periods for newbuild vessels. Limited direct spillover.

Company is UK-incorporated after its November 2026 redomiciliation, with Norway and Denmark legacy shareholder base. Effect is local to the listing.

Low. Single-issuer offshore wind installation results with no broad macro transmission.

Counterpoint

Reaffirmed guidance on a larger fleet and the Menck addition could signal stronger fourth-quarter earnings than the nine-month profit decline suggests.

Key entities

  • Cadeler plc

    Offshore wind installation vessel operator filing the Q3 2026 earnings release.

  • Menck

    Foundation installation equipment provider acquired from Acteon on 11 August 2026.

  • Acteon

    Seller of Menck GmbH and related entities in the combined transaction.

Every CDLR earnings report

This story covers one filing. The ticker page keeps them all: each quarter's reported metrics with year-over-year and sequential comparisons, segments, guidance, and how the numbers landed against the company's own prior outlook.

Related articles

MedAI 8/10

Annalisa Lolli-Ghetti Discloses 13.89% Stake in Cadeler

Annalisa Lolli-Ghetti, majority shareholder of Scorpio Holdings, disclosed a 13.89% stake in Cadeler plc. The stake was acquired through a one-for-one share swap during Cadeler's move from Denmark to the UK. The exchange involved 41,385,792 shares for Scorpio Holdings and 7,971,033 shares for its subsidiary. No further plans for the shares were disclosed.

Med

Cadeler Adds Wind Apex to Dogger Bank C Turbine Installation Campaign

Cadeler signed a contract to install turbines at the 1.2 GW Dogger Bank C wind farm in the UK. The Wind Apex vessel will join the project in Q3 2027, working alongside Jan De Nul's Voltaire. Dogger Bank C is owned by SSE Renewables, Equinor, and Vårgrønn, with SSE leading development and Equinor set to operate the farm. The project is part of the 3.6 GW Dogger Bank Wind Farm, with foundations and substations already installed in 2025.