CleanSpark Reports Fiscal Fourth Quarter and Full Year 2026 Financial and Operating Results
CLEANSPARK, INC. (CLSK) filed an SEC Form 8-K — Results of Operations and Financial Condition. EXHIBIT 99.1 CleanSpark Reports Fiscal Fourth Quarter and Full Year 2026 Financial and Operating Results E xecuted $6.6B high-investment grade lease in Sandersville; project is on time, on budget, and fully funded 585 MW in Texas assigned Batch Zero baseload status, setting the s
How this was made
The 30-second read
Why it matters
Traders can update expectations for contracted revenue visibility (Sandersville triple-net lease), funding structure (7.875% $2.276B notes), and near-term risk (FY revenue declines, net loss, and adjusted EBITDA loss). Bitcoin holdings and mining metrics add an additional cross-asset driver for sentiment.
Market read
Material, company-specific disclosures combine contracted infrastructure growth with secured project funding, while earnings metrics show continued profitability pressure.
What to watch
Liquidity is partly bitcoin-linked (about $1.13B in bitcoin holdings), so equity risk remains sensitive to BTC price moves and collateral terms, not just contracted lease economics.
CleanSpark posts Q4 FY2026 net income of $9.8 million on $120.9 million revenue, while FY2026 shows a $987.1 million net loss after a $177.1 million impairment and lower bitcoin mining revenue; $6.6 billion Sandersville lease and $2.276 billion notes fund the data center project.
Q4 shows positive GAAP net income and non-GAAP Adjusted EBITDA of $345,356 thousand, but revenue fell 46% year over year and the full year shows a GAAP net loss of $(987,092) thousand, an operating loss of $(883,481) thousand and an adjusted EBITDA loss of $(304,225) thousand. Long-term debt rose from $644,586 thousand to $3,988,869 thousand. The company reports the Sandersville project as fully funded and liquidity above $1 billion.
Key metrics
shortened, hover for the filing’s print| Metric | Value | q/q | y/y |
|---|---|---|---|
| Total revenue, Q4 FY2026 (three months ended Sep 30, 2026)GAAP | $120.9M | – | decrease of 46% |
| Total revenue, FY2026 (year ended Sep 30, 2026)GAAP | $576.5M | – | decrease of 25% |
| Cost of revenues (exclusive of D&A), Q4 FY2026GAAP | $79.52M | – | – |
| Cost of revenues (exclusive of D&A), FY2026GAAP | $342.3M | – | – |
| Professional fees, Q4 FY2026GAAP | $6.25M | – | – |
| Professional fees, FY2026GAAP | $28.42M | – | – |
| Payroll expenses, Q4 FY2026GAAP | $38.33M | – | – |
| Payroll expenses, FY2026GAAP | $114.8M | – | – |
| General and administrative expenses, Q4 FY2026GAAP | $15.12M | – | – |
| General and administrative expenses, FY2026GAAP | $64.96M | – | – |
| Loss (gain) on disposal of assets, Q4 FY2026GAAP | $8.14M | – | – |
| Loss (gain) on disposal of assets, FY2026GAAP | $14.83M | – | – |
| Gain on fair value of bitcoin, net, Q4 FY2026 (per reconciliation footnote)GAAP | $305,565 thousand gain | – | – |
| Loss on fair value of bitcoin, net, FY2026 (per reconciliation footnote)GAAP | $281,624 thousand loss | – | – |
| Depreciation and amortization, Q4 FY2026GAAP | $94.94M | – | – |
| Depreciation and amortization, FY2026GAAP | $428.2M | – | – |
| Indirect tax contingency expenses, Q4 FY2026GAAP | $1.40M | – | – |
| Indirect tax contingency expenses, FY2026GAAP | $7.79M | – | – |
| Impairment expense, Q4 FY2026GAAP | $171.7M | – | – |
| Impairment expense, FY2026GAAP | $177.1M | – | – |
| Total costs and expenses, Q4 FY2026GAAP | $109.8M | – | – |
| Total costs and expenses, FY2026GAAP | $1.46B | – | – |
| Income (loss) from operations, Q4 FY2026GAAP | $11.15M | – | – |
| Income (loss) from operations, FY2026GAAP | −$883.5M | – | – |
| Gain (loss) on bitcoin collateral, Q4 FY2026 (per footnote)GAAP | $40,224 thousand gain | – | – |
| Gain (loss) on bitcoin collateral, FY2026 (per footnote)GAAP | $118,740 thousand loss | – | – |
| (Loss) gain on derivative securities, net, Q4 FY2026GAAP | −$28.65M | – | – |
| (Loss) gain on derivative securities, net, FY2026GAAP | −$16.02M | – | – |
| Interest income, Q4 FY2026GAAP | $2.76M | – | – |
| Interest income, FY2026GAAP | $10.16M | – | – |
| Interest expense, Q4 FY2026GAAP | −$4.15M | – | – |
| Interest expense, FY2026GAAP | −$11.94M | – | – |
| Total other income (expense), Q4 FY2026GAAP | $10.44M | – | – |
| Total other income (expense), FY2026GAAP | −$136.1M | – | – |
| Income (loss) before income tax, Q4 FY2026GAAP | $21.59M | – | – |
| Income (loss) before income tax, FY2026GAAP | −$1.02B | – | – |
| Income tax expense (benefit), Q4 FY2026GAAP | $11.79M | – | – |
| Income tax expense (benefit), FY2026GAAP | −$32.49M | – | – |
| Net income (loss), Q4 FY2026GAAP | $9.80M | – | – |
| Net income (loss), FY2026GAAP | −$987.1M | – | – |
| Net income (loss) attributable to common shareholders, Q4 FY2026GAAP | $9.80M | – | – |
| Net income (loss) attributable to common shareholders, FY2026GAAP | −$1.02B | – | – |
| Net income per basic share, Q4 FY2026GAAP | $0.04 per basic share | – | – |
| Net loss per basic share, FY2026GAAP | ($3.74) per basic share | – | – |
| Adjusted EBITDA, Q4 FY2026non-GAAP | $345.4M | – | – |
| Adjusted EBITDA, FY2026non-GAAP | −$304.2M | – | – |
| Bitcoin mined, FY2026other | 7,253 bitcoin | – | decrease of 8% |
| Average hashrate, FY2026other | 36.0 EH/s | – | decrease of 21% |
| Fleet miner efficiency at fiscal year-endother | 14.8 J/Th | – | – |
| Bitcoin held including collateral at fiscal year-endother | 13,530 bitcoin | – | – |
| Derivative-related proceeds under Digital Asset Management program, FY2026other | $30.6M | – | – |
Segments
| Segment | Revenue | q/q | y/y |
|---|---|---|---|
| Bitcoin mining revenue, netNo driver for this revenue line is stated in the filing. It is the only revenue line the filing reports. | $120,940 thousand (Q4 FY2026); $576,534 thousand (FY2026) | – | Q4 decrease of 46%; FY decrease of 25% |
Capital returns
- Treasury stock at cost: $(607,701) thousand at Sep 30, 2026 vs $(145,000) thousand at Sep 30, 2025; 42,365,391 shares held vs 11,759,935 shares held.
- Preferred stock dividends, including deemed dividend: $30,000 thousand FY2026 vs $11,140 thousand FY2025; $— thousand in Q4 FY2026 vs $396 thousand in Q4 FY2025.
- Dividends payable: $— thousand at Sep 30, 2026 vs $396 thousand at Sep 30, 2025.
- Fiscal 2026 derivative-related proceeds under the Digital Asset Management program: $30.6 million.
What drove it
- Sandersville, GA: 20-year, $6.6 billion triple-net lease with a high investment grade tenant. The company states the project is on time and on budget, achieved basis of design alignment on 100% of the anticipated project, and that the project is fully funded through a $2.276 billion issuance of 7.875% senior secured notes due 2031.
- Sandersville construction is stated to be on track to meet a first planned data hall in November 2027.
- Texas portfolio: strategic acquisitions of Sealy (285 MW) and Brazoria (up to 600 MW). Conditional Batch Zero Baseload designation on 585 MW (285 MW in Sealy and 300 MW in Brazoria Phase 1). Conditional Batch Zero Studied Load designation for Brazoria Phase 2 (up to 300 MW).
- Washington, GA: 86 MW of currently energized, grid-connected power. High-density line study submitted to increase power to 500 MW; preliminary results indicate ability to support up to 500 MW of transmission capacity over the next several years.
- Bitcoin mining: fiscal year-end miner efficiency of 14.8 J/Th vs 16.7 J/Th at fiscal year-end 2025, as reported by the company.
Concerns
- FY2026 net loss of $(987,092) thousand, against net income of $364,464 thousand in FY2025. Income (loss) from operations was $(883,481) thousand vs $318,949 thousand.
- Impairment expense of $171,665 thousand in Q4 FY2026 and $177,071 thousand for FY2026; the prior-year columns show no impairment.
- Total revenue fell 46% in Q4 and 25% for the year. Bitcoin mined fell 8% and average hashrate fell 21%, per the company.
- Long-term debt rose from $644,586 thousand to $3,988,869 thousand. Total stockholders' equity fell from $2,175,127 thousand to $785,955 thousand.
- Adjusted EBITDA for FY2026 is a loss of $(304,225) thousand vs $823,373 thousand in FY2025. The company states it does not exclude the fair value of bitcoin or bitcoin collateral gains and losses from this measure.
- The company states that exclusivity at Sealy and Brazoria expired during a period of temporary regulatory uncertainty, and that commercialization efforts are proceeding with the existing Sandersville tenant and others. No tenant is named for those sites.
- Indirect tax contingency expenses, professional fees and loss on disposal of assets increased for FY2026 against FY2025 as printed in the statements.
What to watch
- Sandersville construction milestones against the planned November 2027 first data hall.
- Commercialization of Sealy and Brazoria following expiry of exclusivity; the company names no new tenant or lease for these sites.
- Batch Zero designations: final status of the conditional Baseload and Studied Load designations.
- Washington, GA high-density line study outcome and the 500 MW transmission capacity.
- Bitcoin fair value and collateral gains and losses, which drive large swings in reported net income and in the FY2026 loss.
- Debt service and the increase in long-term debt to $3,988,869 thousand, against liquidity of approximately $1.3 billion.
- Impairment charges on long-lived assets in future periods, given $177,071 thousand recorded in FY2026.
Balance sheet and cash flow
- Cash and cash equivalents: $204,759 thousand at Sep 30, 2026 vs $42,966 thousand at Sep 30, 2025 (press release states approximately $204.8 million).
- Year-end liquidity of approximately $1.3 billion, consisting of approximately $204.8 million in cash and cash equivalents and approximately $1,130.5 million in bitcoin holdings, including current and non-current holdings and bitcoin pledged as collateral. Company states it maintains more than $1 billion in liquidity.
- Restricted cash, noncurrent: $2,046,976 thousand at Sep 30, 2026 vs $— thousand at Sep 30, 2025. Restricted cash, current: $96,369 thousand vs $3,490 thousand.
- Long-term debt, net of current portion, debt discount and debt issuance costs: $3,988,869 thousand at Sep 30, 2026 vs $644,586 thousand at Sep 30, 2025. Current portion of debt: $92,235 thousand vs $176,570 thousand.
- Total assets: $5,249,898 thousand at Sep 30, 2026 vs $3,183,631 thousand at Sep 30, 2025.
- Total liabilities: $4,463,943 thousand at Sep 30, 2026 vs $1,008,504 thousand at Sep 30, 2025.
- Total stockholders' equity: $785,955 thousand at Sep 30, 2026 vs $2,175,127 thousand at Sep 30, 2025.
- Property and equipment, net: $1,471,656 thousand at Sep 30, 2026 vs $1,363,681 thousand at Sep 30, 2025.
- Bitcoin, current plus noncurrent, as shown on the balance sheet: $809,681 thousand and $169,574 thousand at Sep 30, 2026 vs $966,829 thousand and $222,614 thousand at Sep 30, 2025 (balance sheet line items; the press release gives a combined liquidity figure of approximately $1,130.5 million).
- Goodwill: $131,658 thousand at both Sep 30, 2026 and Sep 30, 2025.
Analysis
CleanSpark reports Q4 FY2026 total revenue of $120,940 thousand, down 46% from $223,652 thousand in the year-ago quarter, and FY2026 revenue of $576,534 thousand, down 25% from $766,314 thousand. The filing reports one revenue line, bitcoin mining revenue, net, and gives no segment breakdown or driver for the decline. Bitcoin mined for the year was 7,253, down 8%, with average hashrate of 36.0 EH/s, down 21%, and fiscal year-end fleet efficiency improved to 14.8 J/Th from 16.7 J/Th.
Profitability is mixed by period. Q4 income from operations was $11,151 thousand against $834 thousand a year earlier, and Q4 net income was $9,804 thousand, or $0.04 per basic share. For the full year the company reports an operating loss of $(883,481) thousand, a net loss of $(987,092) thousand and a loss of $(3.74) per basic share, against a FY2025 operating income of $318,949 thousand. The statements show a $305,565 thousand gain on fair value of bitcoin in Q4 FY2026 and a $281,624 thousand loss for the full year, alongside a $171,665 thousand impairment in Q4 and $177,071 thousand for the year. Non-GAAP Adjusted EBITDA was $345,356 thousand in Q4 and $(304,225) thousand for FY2026. The company states it does not exclude bitcoin fair value or bitcoin collateral gains and losses from Adjusted EBITDA.
The balance sheet changed materially. Total assets rose to $5,249,898 thousand from $3,183,631 thousand, with noncurrent restricted cash of $2,046,976 thousand, against none a year earlier. Long-term debt rose to $3,988,869 thousand from $644,586 thousand, and total stockholders' equity fell to $785,955 thousand from $2,175,127 thousand. Cash and cash equivalents were $204,759 thousand, and the company states year-end liquidity of approximately $1.3 billion including bitcoin holdings and states it maintains more than $1 billion in liquidity.
The operating narrative centres on Sandersville, GA, where the company reports a 20-year, $6.6 billion triple-net lease, a $2.276 billion issuance of 7.875% senior secured notes due 2031 that it says fully funds the project, and a turnkey lump sum contract. The company reports the project on time and on budget, with a first data hall planned for November 2027. In Texas it reports 585 MW with conditional Batch Zero Baseload designation and up to 300 MW with Studied Load designation for Brazoria Phase 2, while also stating that exclusivity at Sealy and Brazoria expired during a period of temporary regulatory uncertainty.
The filing contains no financial guidance for FY2027 and no prior outlook was provided, so no guidance comparison is made. Capital returns in the period consisted of treasury stock rising to $(607,701) thousand from $(145,000) thousand, and preferred dividends of $30,000 thousand for FY2026 against $11,140 thousand. The filing does not include a cash flow statement, so operating and free cash flow are not reported.
Management, verbatim
Fiscal 2026 was a defining year for CleanSpark as we made significant progress in executing our strategic transformation,
Matt Schultz, Chairman and Chief Executive Officer
The completion of our Sandersville financing provides dedicated capital and fully funds the project.
Gary Vecchiarelli, President and CFO
Not in the filing
stated, not guessed- Company financial guidance for FY2027 or later periods: not provided in the filing.
- Prior-year and percentage changes for individual cost and expense lines, other than those stated in the text for total revenue and bitcoin mined, hashrate and revenue.
- Prior-year figures for the Q4 and FY2026 net income per basic share (EPS was not printed for FY2025 or Q4 FY2025).
- Prior-quarter (Q3 FY2026) figures: no sequential comparison is printed.
- Prior-year figures for the gain on bitcoin fair value line for the full year are printed; percentage changes for all lines are not printed.
- Cash flow statement: operating cash flow, investing cash flow, financing cash flow and free cash flow are not reported.
- Explanation for the decline in revenue and for the change in bitcoin mining revenue drivers: not stated in the filing.
- Segment or geographic revenue split beyond the single bitcoin mining revenue line: not provided.
- Reasons for the impairment expense: not stated in the filing.
- Adjusted EBITDA year-over-year percentage change: not printed.
- Diluted EPS: only basic EPS is reported.
- Share repurchase amounts in dollars for the period: only treasury stock balances and share counts are printed.
- Consensus estimates and share-price reaction: not in the documents.
Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. Guided figures in the outlook comparison come from the company’s previous release. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.
Background
CleanSpark is a data-center developer with bitcoin mining exposure, and this 8-K furnishes its FY2026 and Q4 operating and financial results plus major infrastructure financing and portfolio updates.
Ticker impact
CleanSpark reports FY2026 and Q4 results plus a 20-year, $6.6B triple-net lease at Sandersville and $2.276B senior notes financing.
Likely upward bias as investors focus on contracted, fully funded infrastructure growth, offset by concern from large net loss and EBITDA loss.
The filing includes hard, company-specific catalysts: $6.6B lease, $2.276B notes due 2031, and year-end liquidity of about $1.3B, all of which can re-rate risk and growth visibility.
Market effects
Reinforces the data-center infrastructure financing model (long-duration leases plus secured debt) as a viable path for AI/HPC buildouts.
Sandersville, GA project progress and permitting may influence local power and construction demand expectations.
Bitcoin holdings and mining output figures tie the company’s near-term sentiment to crypto market conditions and mining economics.
Counterpoint
The reported net loss and adjusted EBITDA loss for FY2026 suggest the business is still in a heavy investment phase, so the lease announcement may not translate into near-term earnings power.
Key entities
- companyCleanSpark, Inc.
Nasdaq-listed data center developer and bitcoin miner reporting FY2026/Q4 results and announcing Sandersville lease and financing.



