$AYA earnings report

Q3-2026 revenue of $103M, up 90% YoY, on record production; Zgounder 2026 silver guidance low end raised. AlphAI read Aya Gold & Silver's Q3 FY2026 filing as strong. 2 quarters are on record below.

Q3 FY2026

AlphAI · Earnings readAYA · Q3 2026 · ended 2026-09-30

Q3-2026 revenue of $103M, up 90% YoY, on record production; Zgounder 2026 silver guidance low end raised

✓Strong quarter

Revenue rose 90% YoY and net income rose 182% YoY, with Zgounder and Boumadine each reporting record production and consolidated cash costs down 25% YoY. Offsets in the filing include a 383,757 oz silver inventory build, lower Zgounder ounces sold versus Q2, and ongoing litigation costs.

Revenue
$103M
90% y/y
Revenue - Silver (Zgounder)
$86.2M
59% y/y
EPS · GAAP
0.22
144% y/y

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Revenue (Q3-2026)GAAP$103.3M–90%
Revenue - Silver (Q3-2026)GAAP$86.17M–59%
Revenue - Pyrite (Q3-2026)GAAP$17.11M–NM
Cost of Sales (Q3-2026)GAAP−$34.99M–6%
Gross Profit (Q3-2026)GAAP$68.30M–220%
Operating Income (Q3-2026)GAAP$59.47M–292%
Income before Income Taxes (Q3-2026)GAAP$54.89M–238%
Net Income (Q3-2026)GAAP$35.01M–182%
Net income attributable to Aya shareholders (Q3-2026)GAAP$33.5M––
Basic EPS (Q3-2026)GAAP0.23–156%
Diluted EPS (Q3-2026)GAAP0.22–144%
Operating Cash Flow (Q3-2026)GAAP$48.08M–115%
Cash and cash equivalents (Q3-2026 table)GAAP$183.8M–42%
Total Assets (Q3-2026)GAAP$731.8M–25%
Total Non-Current Financial Liabilities (Q3-2026)GAAP$43.59M–(48)%
Working Capital (Q3-2026)non-GAAP$153.7M–60%
Revenue (nine months YTD-2026)GAAP$317.4M–150%
Revenue - Silver (nine months YTD-2026)GAAP$291.3M–130%
Revenue - Pyrite (nine months YTD-2026)GAAP$26.09M–NM
Cost of Sales (nine months YTD-2026)GAAP−$101.9M–18%
Gross Profit (nine months YTD-2026)GAAP$215.5M–431%
Operating Income (nine months YTD-2026)GAAP$190.2M–627%
Income before Income Taxes (nine months YTD-2026)GAAP$187.7M–403%
Net Income (nine months YTD-2026)GAAP$118.6M–324%
Operating Cash Flow (nine months YTD-2026)GAAP$166.7M–337%
Basic EPS (nine months YTD-2026)GAAP0.81–286%
Diluted EPS (nine months YTD-2026)GAAP0.78–290%
Zgounder silver produced (Q3-2026)other1,497,749 oz1%11%
Zgounder silver sold (Q3-2026)other1,243,092 oz(6)%(9)%
Zgounder cash cost per silver oz sold (Q3-2026)non-GAAP17.53(1)%(16)%
Zgounder average net realized silver price (Q3-2026)other69.32 $/oz2%74%
Zgounder ore processed (Q3-2026)other376,863 tonnes6%23%
Zgounder milling operations (Q3-2026)other4,096 tpd5%23%
Combined mill recovery (Q3-2026)other92.0%0.8%(0.5)%
Zgounder silver produced (nine months YTD-2026)other4,252,287 oz–23%
Zgounder cash cost per silver oz sold (nine months YTD-2026)non-GAAP17.97–(12)%
Boumadine pyrite reclaimed (Q3-2026)other49,890 tonnes191%NM
Boumadine silver equivalent produced (Q3-2026)other536,879 oz AgEq186%NM
Boumadine silver equivalent sold (Q3-2026)other492,932 oz AgEq167%NM
Boumadine cash cost per AgEq oz sold (Q3-2026)non-GAAP10.42(2)%NM
Boumadine average net realized AgEq price (Q3-2026)other34.72 $/oz(1)%NM
Consolidated silver equivalent produced (Q3-2026)other2,034,628 oz AgEq21%51%
Consolidated silver equivalent sold (Q3-2026)other1,736,024 oz AgEq15%27%
Consolidated average net realized AgEq price (Q3-2026)other59.50 $/oz(7)%49%
Consolidated cash cost per AgEq oz sold (Q3-2026)non-GAAP15.51(8)%(25)%
Consolidated silver equivalent produced (nine months YTD-2026)other5,204,752 oz AgEq–51%
Consolidated silver equivalent sold (nine months YTD-2026)other4,669,505 oz AgEq–31%
Consolidated cash cost per AgEq oz sold (nine months YTD-2026)non-GAAP16.82–(17)%

Segments

SegmentRevenueq/qy/y
Revenue - Silver (Zgounder)Reported in the financial highlights table as Revenue - Silver. The filing does not give a separate driver for this line.$86.17M–59%
Revenue - Pyrite (Boumadine pyrite reclaim)The filing states that bulk shipments of pyrite were introduced in the quarter as planned and accounted for most sales, with containerized shipments continuing. Pyrite sales remain on track to meet guidance, per the company.$17.11M–NM

FY2026 production guidance (as stated in the Q3-2026 release) outlook

  • NoteConsolidated 2026 silver equivalent production expected at 6.6-6.8 Moz (AgEq), including 5.6-5.8 Moz from Zgounder
  • NoteZgounder 2026 silver production guidance narrowed to 5.6-5.8 million ounces; the low end raised from the prior 5.2-5.8 million ounce range
  • NoteFull-year cash costs at the Zgounder Silver Mine expected to remain below guidance of $21.50/oz
  • NoteConsolidated guidance includes approximately 1.0 Moz AgEq from the Boumadine pyrite reclaim operation
  • NotePyrite sales remain on track to meet guidance
  • NoteFull-year drilling at Boumadine now expected to exceed plan
  • NoteGuidance assumptions: silver price $50.00/oz, gold price $4,000/oz, USD/CAD 1.40, USD/MAD 9.00, 80:1 Au:Ag ratio for AgEq guidance purposes

Capital returns

  • The filing does not report share repurchases or dividends for Q3-2026 or the nine months.

What drove it

  • Revenue growth of 90% YoY reflects, per the company, a higher average net realized AgEq price and higher consolidated ounces sold, primarily driven by the Boumadine reclaim operation.
  • The company states that Zgounder silver production rose 11% YoY mainly due to higher mill throughput from continued optimization initiatives, including additional crushing capacity provided by a contractor.
  • The company attributes the 17.53/oz Zgounder cash cost decline of 16% YoY to higher mill throughput and efficiencies from optimization initiatives.
  • The company states that General and administrative expenses increased versus Q3-2025, reflecting higher professional fees related to the Duro Felguera litigation and costs associated with the Company's U.S. listing and reporting requirements.
  • The company states that operating cash flow growth was partially offset by working capital investments, mainly related to inventories (ore stockpiles, silver in circuit and silver ingots).
  • The company states that Boumadine cash costs per AgEq ounce were negatively impacted by a lower gold-to-silver ratio compared with the 80:1 production guidance assumption; realized ratio was approximately 68:1 in Q3-2026 and 64:1 year-to-date.

Concerns

  • Zgounder silver sold fell 6% QoQ and 9% YoY, while silver inventory rose to 383,757 oz from 212,516 oz at Q2-2026.
  • Operating cash flow of $48M included working capital investment, mainly inventories, according to the company.
  • Boumadine AgEq production would have been approximately 52,011 ounces higher in Q3-2026 at the 80:1 guidance ratio, per the company's footnote; the realized ratio was lower.
  • Boumadine is at the exploration and evaluation stage and is not in commercial production, per the filing.
  • The 2026 PEA is preliminary and includes inferred mineral resources; the filing states there is no certainty it will be realized.
  • The Boumadine pyrite reclaim operation is expected to last approximately 20 to 24 months from November 19, 2025, or until the stockpile is depleted.
  • Zgounder Q3-2026 silver production excludes 138,100 oz of silver cement in inventory not yet smelted at quarter-end.
  • Professional fees tied to litigation with Duro Felguera S.A. (appeal proceedings in Spain and ICC arbitration) increased G&A, per the filing.

What to watch

  • Delivery against the narrowed Zgounder 5.6-5.8 Moz silver guidance and the consolidated 6.6-6.8 Moz AgEq range.
  • Whether silver inventory built in Q3-2026 is sold; the company attributes the build to the timing of sales.
  • Open-pit pushbacks at Zgounder, which the release says start toward the end of 2026 and continue through 2027.
  • Boumadine feasibility study work, which the release describes as underway.
  • Completion of the proposed Sama Resources Inc. transaction (term sheet dated November 4, 2026) for the Azegour project in exchange for an equity interest of approximately 19.11% in Sama.
  • Realized gold-to-silver ratio at Boumadine relative to the 80:1 guidance assumption.
  • Drilling from the Level 1825 exploration drift at Zgounder, with drilling west of the Zgounder Fault to follow.

Balance sheet and cash flow

  • Cash and cash equivalents of $184M at quarter-end (table: 183,791 US$ thousands), excluding $16M of restricted cash; the release compares this with $136M as at December 31, 2025.
  • Operating cash flow of $48M in Q3-2026, including $54M before changes in working capital, per the release.
  • Silver inventory from the Zgounder operation of 383,757 oz at quarter-end, compared with 212,516 oz at the end of Q2-2026, which the company attributes to the timing of sales.
  • Exploration expenditures of $18M focused on the Boumadine infill drilling program; $6M invested in capital projects at Zgounder, including completion of the Zgounder Tailings Storage Facility.
  • Zgounder ore stockpile grew 16% QoQ to 434,538 t.
  • Total assets of 731,824 (US$ thousands) and working capital of 153,663 (US$ thousands, non-GAAP) at quarter-end.

Analysis

Aya reported Q3-2026 revenue of $103M (US$ 103,287 thousand), up 90% YoY, from 1.7 million consolidated AgEq ounces sold at a realized price of $59.50/oz AgEq, up 49% YoY. Silver revenue was 86,174 (US$ thousands), up 59% YoY, and pyrite revenue from the Boumadine reclaim operation was 17,113 (US$ thousands), a line with no prior-year comparison. Gross profit was 68,298 (US$ thousands), operating income 59,472 (US$ thousands), and net income 35,007 (US$ thousands), up 182% YoY. Basic EPS was 0.23 and diluted EPS was 0.22, both GAAP as reported under IFRS.

Operations were the strongest part of the report. Zgounder produced 1,497,749 oz of silver, up 11% YoY and 1% QoQ, on ore processed of 376,863 tonnes, up 23% YoY, with milling at 4,096 tpd. Zgounder cash costs were 17.53/oz, down 16% YoY but only 1% lower QoQ. Consolidated production reached 2,034,628 oz AgEq, up 51% YoY and 21% QoQ. Silver sold at Zgounder fell 6% QoQ to 1,243,092 oz, so the period's production was not fully sold. Silver inventory rose to 383,757 oz from 212,516 oz at Q2-2026, which the company attributes to the timing of sales. The Boumadine reclaim operation produced 536,879 oz AgEq, up 186% QoQ, with a realized AgEq price of 34.72/oz and cash costs of 10.42/oz AgEq.

Margins and cash generation improved on a year-to-date basis. Nine-month revenue was 317,355 (US$ thousands), up 150%, and nine-month operating income was 190,210 (US$ thousands), up 627%. Nine-month operating cash flow was 166,652 (US$ thousands), up 337%. Working capital was 153,663 (US$ thousands) and total assets were 731,824 (US$ thousands). Non-current financial liabilities fell to 43,585 (US$ thousands) from 84,610 (US$ thousands) a year earlier. The release reports cash of $184M, excluding $16M restricted cash, and compares this with $136M at December 31, 2025. The filing does not report dividends or share repurchases.

The guidance change is narrow and specific. Zgounder 2026 silver production guidance was narrowed to 5.6-5.8 Moz from 5.2-5.8 Moz, with the low end raised. Consolidated 2026 production is guided at 6.6-6.8 Moz AgEq, and the release states that Zgounder full-year cash costs are expected to remain below $21.50/oz. The guidance uses a $50.00/oz silver price and an 80:1 Au:Ag ratio, while the realized Boumadine ratio was about 68:1 in Q3-2026 and 64:1 year-to-date. The company states that this difference reduced reported Boumadine AgEq ounces and increased unit costs.

Attention should go to the Zgounder inventory build, the Boumadine pyrite revenue, which the company says is limited in duration to roughly 20 to 24 months, and the litigation costs that drove a higher G&A line, as well as the Boumadine PEA. The 2026 PEA reports an after-tax NPV 5% of $3.5B and a 93% IRR, but the release describes it as preliminary, based on inferred resources, and Boumadine is not in commercial production.

Management, verbatim

Q3 was another record quarter for Aya, with Zgounder and the Boumadine reclaim operation each achieving their highest production to date

Benoit La Salle, President & CEO

On the strength of year-to-date performance, we are raising the low end of our 2026 production guidance at Zgounder to 5.6–5.8 million ounces of silver, up from 5.2–5.8 million ounces, and we are set for a strong finish to the year.

Benoit La Salle, President & CEO

Not in the filing

stated, not guessed
  • No prior-quarter (Q2-2026) figures are printed for the financial highlights table lines (revenue, cost of sales, operating income, net income, EPS, operating cash flow, total assets, liabilities, working capital).
  • Prior-quarter net income and EPS (Q2-2026) are not printed.
  • Prior-year figures for the Boumadine pyrite line and the Boumadine reclaim operation are not printed (shown as dashes).
  • Prior-year comparison for cash on the table is Q3-2025 (129,184 US$ thousands); the release's $136M comparator is at December 31, 2025 and is not a prior-year figure.
  • Interest expense, income tax expense and the detailed operating expense lines (G&A amount, exploration, depreciation) are not printed in the release.
  • Basic and diluted share counts are not printed.
  • No dividends, share repurchases or other capital return amounts are printed.
  • No Q3-2025 total assets split, segment margins or segment operating income are printed.
  • Consensus estimates, analyst expectations and share price reaction are not in the filing.
  • Zgounder cash cost guidance is a ceiling of $21.50/oz; no full-year actual cash cost is printed.
  • The previous outlook gave only a qualitative statement that the 2026 operations outlook was unchanged, with no numeric guidance to compare against the third-quarter figures.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. Guided figures in the outlook comparison come from the company’s previous release. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Q2-2026

AlphAI · Earnings readAYA · Q2-2026 · ended June 30, 2026

Aya Gold & Silver Reports Q2-2026 Results and Delivers Record Operational Performance

✓Strong quarter

Revenue increased 151% YoY, net income increased 305% YoY, operating cash flow increased 522% YoY, and consolidated AgEq production increased 61% YoY while consolidated cash costs per AgEq ounce sold decreased 21% YoY.

Revenue
$96.8M
151% y/y
Zgounder Silver Mine
$90.3M
134% y/y
EPS · other
$0.23
283% y/y

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Revenueother$96.79M–151%
Revenue - Silverother$90.32M–134%
Revenue - Pyriteother$6.47M–NM
Cost of Salesother$33.38M–12%
Gross Profitother$63.41M–609%
Operating Incomeother$53.16M–593%
Income before Income Taxesother$56.51M–441%
Net Incomeother$35.04M–305%
Income Per Share (EPS) - Basicother$0.24–243%
Income Per Share (EPS) - Dilutedother$0.23–283%
Operating Cash Flowother$48.40M–522%
Cash and cash equivalentsother$182.8M–61%
Total Assetsother$702.3M–24%
Total Non-Current Financial Liabilitiesother$57.11M–(32)%
Working Capitalnon-GAAP$144.8M–64%
YTD 2026 Revenuesother$214.1M–195%
YTD 2026 Gross Profitother$147.2M–667%
YTD 2026 Operating Incomeother$130.7M–1,089%
YTD 2026 Net Incomeother$83.57M–437%
YTD 2026 Operating Cash Flowother$118.6M–655%
YTD 2026 Income Per Share (EPS) - Basicother0.58–383%
YTD 2026 Income Per Share (EPS) - Dilutedother0.56–409%
Consolidated silver equivalent producedother1,677,310 oz12%61%
Consolidated silver equivalent soldother1,507,121 oz6%32%
Average net realized silver equivalent priceother$64.22/oz(22)%90%
Cash costs per silver equivalent ounce soldnon-GAAP$16.82(9)%(21)%
Combined Mill Recoveryother91.2 %1.8%4.7%
Milling Operationsother3,889 tpd7%29%
Record mining rateother4,880 tpd––

Segments

SegmentRevenueq/qy/y
Zgounder Silver MineSilver production was 1,489,526 oz, up 43% YoY and 18% QoQ, reflecting the ramp-up of mining and milling operations and continued operational improvements.$90.32M–134%
Boumadine Pyrite Reclaim OperationThe operation produced 187,784 oz AgEq and sold 184,536 oz AgEq during Q2-2026. The overall Boumadine polymetallic project remains at the exploration and evaluation stage and is not in commercial production.$6.47M–NM

Amounts quoted below without a unit are in thousands, as in the filing’s tables. Per-share figures are as printed.

2026 outlook

  • Note2026 operation outlook remains unchanged from the outlook disclosed in the Company’s March 31, 2026 news release.

What drove it

  • Revenue growth reflected a higher average net realized AgEq price of $64.22/oz and increased consolidated ounces sold of 1.5 Moz AgEq.
  • Zgounder processed 353,888 tonnes of ore at 3,889 tpd, with combined mill recovery of 91.2 %.
  • Zgounder cash costs per silver ounce sold were $17.69, decreasing 17% from Q2-2025 and 5% from Q1-2026, driven by higher throughput, increased production volumes and efficiencies from optimization initiatives.
  • The open pit is fully operational and integrated into production. Unit costs also benefited from a strip ratio of 10, reflecting continued mining of ore-rich zones.
  • Aya completed 50,567 m of diamond drilling at Boumadine and 4,440 m at Zgounder in Q2-2026.

Concerns

  • Q2-2026 net income included approximately $5M of costs, primarily related to professional fees for the ongoing litigation with Duro Felguera S.A. and costs associated with the Nasdaq listing.
  • Average net realized silver equivalent price was down 22% QoQ to $64.22/oz from $82.22/oz.
  • Boumadine crushed inventory stood at 298,977 oz AgEq equivalent at the end of Q2-2026, located at various ports and awaiting shipment.
  • The pyrite reclaim operation is expected to be of limited duration, lasting approximately 20 to 24 months from November 19, 2025, or until the stockpile is depleted.
  • Cash costs per AgEq ounce sold at Boumadine were negatively impacted by changes in the gold-to-silver ratio during the quarter.

What to watch

  • Bulk shipments of reclaimed pyrite inventory in H2-2026, in addition to ongoing containerized shipments.
  • Completion of the updated Boumadine mineral resource estimate and preliminary economic assessment, alongside feasibility study work.
  • H2-2026 drilling beyond the Western Fault supported by the 1,825-metre exploration drift at Zgounder.
  • Sustained mining and processing rates above nameplate capacity, cash costs, and delivery against the unchanged 2026 operational outlook.
  • Completion of customary post-closing administrative formalities in Morocco for the acquisition of the Zagora, Agadir-Melloul and Goulmim exploration portfolio.

Balance sheet and cash flow

  • Cash and cash equivalents were $183M, compared to $136M as of December 31, 2025. This excludes $16M of restricted cash.
  • The Company generated $48M in cash flow from operating activities, including $45M before changes in working capital.
  • Exploration expenditures were $11M and $11M was invested in capital projects at Zgounder.
  • The Company reimbursed $15M to EBRD for the facility it had engaged and announced on May 12, 2025. The facility is now fully repaid, ahead of maturity.
  • Working Capital was $144,771 (in thousands of US$), consisting of current assets of $286,306 less current liabilities of $141,535.

Analysis

Aya reported a sharply stronger Q2-2026. Revenues were $96,794 (in thousands of US$), up 151% YoY, as consolidated AgEq ounces sold rose 32% and the average net realized AgEq price rose 90% to $64.22/oz. Gross Profit rose 609% to $63,413 (in thousands of US$), Operating Income increased 593% to $53,155 (in thousands of US$), and Net Income increased 305% to $35,038 (in thousands of US$). The quarter also included approximately $5M of costs related primarily to the DF litigation and the Nasdaq listing.

Operations at Zgounder supplied the principal production advance. Silver production was 1,489,526 oz, up 43% YoY and 18% QoQ. Ore processed increased 29% YoY to 353,888 tonnes, milling operations reached a record 3,889 tpd, and combined mill recovery reached 91.2 %. The open pit is fully operational and integrated into production. These throughput and production gains supported a 17% YoY reduction in Zgounder cash costs per silver ounce sold to $17.69.

Boumadine added $6,473 (in thousands of US$) of pyrite revenue and produced 187,784 oz AgEq, but the operation is a limited-duration stockpile reclaim initiative rather than commercial production from the broader polymetallic project. Crushed inventory of 298,977 oz AgEq equivalent was awaiting shipment at ports at quarter-end, with bulk shipments expected in H2-2026. The reported AgEq unit-cost measure at Boumadine was affected by a compressed gold-to-silver ratio, which reduced reported AgEq ounces and increased unit costs on that basis.

Cash generation and liquidity improved materially. Operating cash flow was $48,402 (in thousands of US$), up 522% YoY, while cash and cash equivalents were $183M and restricted cash was $16M. Aya spent $11M on exploration and $11M on Zgounder capital projects, completed Phase 2 of the TSF in early Q3-2026, and repaid $15M to EBRD, fully repaying that facility ahead of maturity. Total Non-Current Financial Liabilities were $57,107 (in thousands of US$), down 32% YoY.

Aya stated that its 2026 operational outlook remains unchanged, though the release does not reproduce the numerical targets from the March 31, 2026 outlook. The central execution markers are sustained Zgounder throughput and cost performance, shipments from the Boumadine pyrite inventory, drilling progress toward an updated Boumadine MRE and PEA, and the development of the Boumadine feasibility study.

Management, verbatim

Q2 was a record operating quarter for Aya. Zgounder delivered record mining and processing rates, demonstrating the plant’s ability to operate at sustained rates well above the nameplate capacity and in line with the updated Zgounder Technical Report. This strong operational performance is translating into lower cash costs, increased operating leverage and strong cash flow generation, while keeping us firmly on track to deliver our 2026 guidance.

Benoit La Salle, President & CEO

At the same time, we continue to advance our district-scale Boumadine project, including infill drilling ahead of an updated MRE and PEA. These achievements reflect the strength of our assets and the execution capabilities of our team, positioning Aya for continued growth and long-term value creation.

Benoit La Salle, President & CEO

Not in the filing

stated, not guessed
  • Numerical 2026 revenue guidance
  • Numerical 2026 gross-margin guidance
  • Numerical 2026 operating-expense guidance
  • Numerical 2026 tax-rate guidance
  • Free cash flow
  • GAAP or IFRS gross margin
  • Operating expenses
  • Effective tax rate
  • Capital-return activity, including dividends and share repurchases
  • Prior-quarter comparisons for quarterly financial statement metrics
  • Prior outlook document and its numerical targets, preventing comparison of reported results with prior guidance

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. Guided figures in the outlook comparison come from the company’s previous release. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Questions about AYA earnings dates

When is Aya Gold & Silver's next earnings date?
AlphAI has no date for AYA yet. We do not publish estimates, so this page shows a date the day we have one.
Why is there sometimes no date?
AlphAI leaves out estimates. Many sites fill the gap by adding about 91 days to the last report, but that arithmetic is a guess, and a wrong date costs a reader more than a missing one, so we show nothing until a date is set, and a company can still move it. Every quarter already on this page is read straight from the SEC filing: an 8-K item 2.02 for US filers, a 6-K earnings release for foreign private issuers.