Keel Infrastructure Reports Third Quarter 2026 Results Continued progress with permitting and commercialization; advanced lease negotiations across three near-term sites Commenced construction at Moses Lake; expected to be first energized site generating HPC revenue in 2027. AlphAI read Keel Infrastructure's Q3 FY2026 filing as mixed. 2 quarters are on record below.

Q3 FY2026

AlphAI · Earnings readKEEL · Q3 2026 · ended September 30, 2026

Keel Infrastructure Reports Third Quarter 2026 Results Continued progress with permitting and commercialization; advanced lease negotiations across three near-term sites Commenced construction at Moses Lake; expected to be first energized site generating HPC revenue in 2027

→Mixed quarter

Keel advanced construction, permitting and lease negotiations for its HPC infrastructure strategy, but continuing-operations revenue declined 59%, gross margin was (53)%, and Adjusted EBITDA was negative $27,447 (U.S.$ in thousands).

Revenue
$27.6M
(59) % y/y
Gross margin · GAAP
(53) %

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Q3 2026 revenueGAAP$27.60M–(59) %
Nine months ended September 30, 2026 revenueGAAP$95.03M–(46) %
Q3 2026 cost of revenuesGAAP−$42.20M–(40) %
Nine months ended September 30, 2026 cost of revenuesGAAP−$222.7M–22 %
Q3 2026 gross lossGAAP−$14.60M–548 %
Nine months ended September 30, 2026 gross lossGAAP−$127.7M–nm
Q3 2026 gross marginGAAP(53) %––
Nine months ended September 30, 2026 gross marginGAAP(134) %––
Q3 2026 general and administrative expensesGAAP−$34.29M–100 %
Nine months ended September 30, 2026 general and administrative expensesGAAP−$92.44M–71 %
Q3 2026 change in fair value of digital assetsGAAP$73.56M–nm
Nine months ended September 30, 2026 change in fair value of digital assetsGAAP$23.09M–nm
Q3 2026 realized loss on sale of digital assetsGAAP−$32.23M–(771) %
Nine months ended September 30, 2026 realized loss on sale of digital assetsGAAP−$45.22M–(275) %
Q3 2026 gain on disposition of property, plant and equipment and depositsGAAP$2.70M–nm
Nine months ended September 30, 2026 gain on disposition of property, plant and equipment and depositsGAAP$1.78M–(19) %
Q3 2026 impairment of long-lived assetsGAAP−$2.81M–(69) %
Nine months ended September 30, 2026 impairment of long-lived assetsGAAP−$6.38M–(30) %
Q3 2026 operating lossGAAP−$7.67M–(58) %
Nine months ended September 30, 2026 operating lossGAAP−$246.8M–478 %
Q3 2026 operating marginGAAP(28) %––
Nine months ended September 30, 2026 operating marginGAAP(260) %––
Q3 2026 interest incomeGAAP$5.83M–nm
Nine months ended September 30, 2026 interest incomeGAAP$12.44M–602 %
Q3 2026 interest expenseGAAP−$4.45M–117 %
Nine months ended September 30, 2026 interest expenseGAAP−$12.70M–233 %
Q3 2026 loss on derivative assets and liabilitiesGAAP−$55.3M–(554) %
Nine months ended September 30, 2026 gain on derivative assets and liabilitiesGAAP$20.18M–65 %
Q3 2026 loss on extinguishment of long-term debtGAAP—–— %
Nine months ended September 30, 2026 loss on extinguishment of long-term debtGAAP−$21.60M–(100) %
Q3 2026 other income (expenses)GAAP$721K–122 %
Nine months ended September 30, 2026 other expensesGAAP−$3.86M–4 %
Q3 2026 total other expenseGAAP−$53.20M–(817) %
Nine months ended September 30, 2026 total other expenseGAAP−$5.55M–(185) %
Q3 2026 loss before taxes from continuing operationsGAAP−$60.87M–451 %
Nine months ended September 30, 2026 loss before taxes from continuing operationsGAAP−$252.4M–597 %
Q3 2026 income tax expenseGAAP−$1.52M–nm
Nine months ended September 30, 2026 income tax expenseGAAP−$1.53M–742 %
Q3 2026 loss from continuing operationsGAAP−$62.39M–467 %
Nine months ended September 30, 2026 loss from continuing operationsGAAP−$253.9M–598 %
Q3 2026 loss per basic and diluted share from continuing operationsGAAP$0.10 loss per basic and diluted share––
Q3 2026 loss from discontinued operationsGAAP−$323K–(99) %
Nine months ended September 30, 2026 loss from discontinued operationsGAAP−$19.15M–(70) %
Q3 2026 net lossGAAP−$62.71M–62 %
Nine months ended September 30, 2026 net lossGAAP−$273.1M–174 %
Q3 2026 depreciation and amortizationGAAP$12.63M–(52) %
Nine months ended September 30, 2026 depreciation and amortizationGAAP$124.5M–74 %
Q3 2026 EBITDA from continuing operationsnon-GAAP−$49.63M–(391) %
Nine months ended September 30, 2026 EBITDA from continuing operationsnon-GAAP−$127.7M–(443) %
Q3 2026 EBITDA marginnon-GAAP(180) %––
Nine months ended September 30, 2026 EBITDA marginnon-GAAP(134) %––
Q3 2026 stock-based compensationnon-GAAP$8.81M–209 %
Nine months ended September 30, 2026 stock-based compensationnon-GAAP$21.37M–105 %
Q3 2026 costs not associated with ongoing operationsnon-GAAP—–(100) %
Nine months ended September 30, 2026 costs not associated with ongoing operationsnon-GAAP$6.41M–(41) %
Q3 2026 other expense (income)non-GAAP−$3.42M–(208) %
Nine months ended September 30, 2026 other expensenon-GAAP$2.09M–38 %
Q3 2026 Adjusted EBITDA from continuing operationsnon-GAAP−$27.45M–(243) %
Nine months ended September 30, 2026 Adjusted EBITDA from continuing operationsnon-GAAP−$67.85M–(307) %
Q3 2026 Adjusted EBITDA marginnon-GAAP(99) %––
Nine months ended September 30, 2026 Adjusted EBITDA marginnon-GAAP(71) %––

Amounts quoted below without a unit are in thousands, as in the filing’s tables. Per-share figures are as printed.

2027 and Q1 2027 outlook

  • NoteMoses Lake is expected to be the first energized site generating HPC revenue in 2027.
  • NoteDetailed load studies for expansion capacity at Panther Creek (up to 500 MW) and Scrubgrass (up to 1.3 GW) remain on track for completion in Q1 2027.
  • NoteThe load studies represent up to a ~300% potential increase of Secured 1 Capacity for data centers from 478 MW to 1,928 MW.

What drove it

  • Revenue decreased largely due to the deliberate cessation of U.S. Bitcoin mining operations during Q2 2026 to advance HPC/AI development and a decline in average Bitcoin price.
  • General and administrative expenses reflected increased hiring of senior subject-matter experts, professional fees, and higher stock-based compensation.
  • Moses Lake received all necessary permits, clearing Notice to Proceed, and construction began in September 2026.
  • Sharon and Panther Creek cleared three permits, with four environmental permits remaining, of which two are in draft stage.
  • Revised site plans at Sharon and Panther Creek were stated to be fully compliant with Pennsylvania’s new Executive Order, with no meaningful changes to project costs or timelines for tenants.

Concerns

  • The Company reported a gross loss of (14,598) (U.S.$ in thousands), a gross margin of (53) %, and Adjusted EBITDA from continuing operations of (27,447) (U.S.$ in thousands) in Q3 2026.
  • Loss from continuing operations included a $55 million non-cash unrealized loss on the fair value of capped calls associated with the 2025 convertible notes offering.
  • The release identifies limited remaining revenue sources until data centers generate revenue.
  • Lease execution, project financing, permitting, construction and energization remain subject to the risks identified in the forward-looking statements.

What to watch

  • Execution of leases across the three near-term sites and the terms obtained from prospective customers.
  • Moses Lake construction progress and the expected generation of HPC revenue in 2027.
  • Completion in Q1 2027 of Panther Creek and Scrubgrass load studies.
  • Progress toward clearing the four remaining environmental permits at Sharon and Panther Creek.
  • The effect of selling Bitcoin mined in Quebec daily on exposure to Bitcoin price movements.

Balance sheet and cash flow

  • As of November 4, 2026, the Company had a liquidity of approximately $780 million in unrestricted cash.
  • During the third quarter, the Company sold 2,520 Bitcoin, comprising its entire treasury position of 2,261 Bitcoin and the 259 Bitcoin mined during the quarter, totaling $192 million in proceeds.
  • As of September 30, Keel's Bitcoin holdings were nominal.
  • Bitcoin mined from operations in Quebec will be sold on a daily basis moving forward.

Analysis

Q3 results reflect Keel's planned transition away from U.S. Bitcoin mining and toward HPC/AI infrastructure development. Revenue was 27,603 (U.S.$ in thousands), down (59) %, which the Company attributed to the cessation of U.S. Bitcoin mining operations during Q2 2026 and a decline in average Bitcoin price. The reduced legacy revenue base was accompanied by a gross loss of (14,598) (U.S.$ in thousands) and a gross margin of (53) %.

Operating performance was pressured by higher development-stage overhead. General and administrative expenses were (34,289) (U.S.$ in thousands), up 100 %, reflecting senior hiring, professional fees and higher stock-based compensation. Operating loss improved to (7,672) (U.S.$ in thousands) from (18,469) (U.S.$ in thousands), but this included a 73,564 (U.S.$ in thousands) change in fair value of digital assets. Adjusted EBITDA from continuing operations was (27,447) (U.S.$ in thousands), compared with 19,236 (U.S.$ in thousands).

Below operating income, a (55,300) (U.S.$ in thousands) loss on derivative assets and liabilities drove loss from continuing operations to (62,388) (U.S.$ in thousands), or a $0.10 loss per basic and diluted share. The Company identified this as primarily a $55 million non-cash unrealized loss on the fair value of capped calls associated with the 2025 convertible notes offering. During the quarter it also sold 2,520 Bitcoin for $192 million in proceeds and ended September 30 with nominal Bitcoin holdings.

The operational milestones center on monetizing the HPC pipeline. Moses Lake received all necessary permits and began construction in September 2026, with HPC revenue expected in 2027. Sharon and Panther Creek cleared three permits but still have four environmental permits remaining, including two in draft stage. Management also cited expansion studies at Panther Creek and Scrubgrass, due in Q1 2027, that represent up to a ~300% potential increase in Secured 1 Capacity from 478 MW to 1,928 MW.

Liquidity was approximately $780 million in unrestricted cash as of November 4, 2026, and management stated it had no current need for debt or equity financing before signing a lease. The release did not provide financial revenue, margin, expense or tax-rate guidance. The critical reported milestones are lease execution, project financing, remaining permits, site construction and energization needed to convert the development pipeline into HPC revenue.

Management, verbatim

Power supply is getting scarcer while demand keeps climbing. Keel’s 2027 and 2028 power is further advanced, more secure, and closer to delivery than it was last quarter. With competitive tension high at all three near-term sites, and multiple creditworthy parties at the negotiation table, I have every confidence we will sign the right leases for each site, ones that deliver the most attractive returns for our shareholders.

Ben Gagnon, CEO

We remain strongly capitalized, with approximately $780 million of cash liquidity and no current need for debt or equity financing before signing a lease. Capital we deploy ahead of a lease becomes part of our equity contribution to a project's financing, and we examine opportunities to recycle capital on an ongoing basis. Our strategy is to advance at the speed our customers require, while signing leases and obtaining project financing on terms that will deliver attractive returns for our shareholders.

Jonathan Mir, CFO

Not in the filing

stated, not guessed
  • Forward financial revenue guidance
  • Forward gross-margin guidance
  • Forward operating-expense guidance
  • Forward tax-rate guidance
  • Prior-quarter comparisons for reported financial metrics
  • Operating cash flow
  • Free cash flow
  • Cash balance as of September 30, 2026
  • Debt balance
  • Capital expenditures
  • Share repurchases
  • Dividends
  • Segment revenue disclosure
  • GAAP diluted EPS beyond the Q3 continuing-operations loss per share disclosed in the narrative

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Second Quarter 2026

AlphAI · Earnings readKEEL · Second Quarter 2026 · ended June 30, 2026

Keel Infrastructure Reports Second Quarter 2026 Results

→Mixed quarter

Continuing legacy operations recorded sharply lower revenue and moved to operating and continuing-operations losses, while the Company raised $458 million, reported approximately $819 million of liquidity, and advanced permitting, equipment delivery, and commercial discussions for its HPC infrastructure sites.

Revenue
$30M
down 50% year over year y/y

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Revenue from Continuing Legacy OperationsGAAP$30M–down 50% year over year
General and administrative expensesGAAP$31M––
Operating lossGAAP$141M––
Non-cash depreciationGAAP$84M––
Loss from continuing operationsGAAP$64M––
Loss per basic and diluted share from continuing operationsGAAP$0.11 loss per basic and diluted share––
Adjusted EBITDAnon-GAAPnegative $24 million–down from $7 million in Q2 2025

What drove it

  • Revenue decreased largely due to a decline in average Bitcoin price and the shutdown of the Moses Lake cryptocurrency mining operations in the U.S. in April 2026.
  • General and administrative expenses increased largely due to targeted hiring of senior subject-matter experts as the Company scales into the project management phase of its strategy.
  • The Company secured zoning and land development approvals across Panther Creek and Sharon, while environmental permit applications are progressing across all three priority sites.
  • The Company accepted delivery of the first Vertiv modules at Moses Lake and additional long-lead-time items at Sharon and Moses Lake, began executing final fiber contracts across all three sites, and continued refining data center designs to improve power density.
  • The Company is in active negotiations with prospective tenants at its priority sites and reported an agreement with Hydro-Sherbrooke for the conditional transfer and operation of 96 MW of existing capacity.

Concerns

  • Revenue from continuing legacy operations was down 50% year over year.
  • Operating results moved from operating income of $11 million in Q2 2025 to an operating loss of $141 million.
  • Loss from continuing operations was $64 million, compared with income from continuing operations of $13 million in Q2 2025.
  • Adjusted EBITDA was negative $24 million, down from $7 million in Q2 2025.
  • The Company completed the decommissioning of all U.S. Bitcoin mining operations, leaving results dependent on execution of the HPC infrastructure transition.
  • The filing identifies risks related to permitting, development delays and cost overruns, financing availability, supply chains, customer concentration, and Bitcoin-price volatility.

What to watch

  • Progress toward full permitting and infrastructure delivery at the three priority sites.
  • Conversion of active tenant negotiations into commercial agreements and lease signings.
  • Execution of construction and delivery schedules following receipt of Vertiv modules and other long-lead-time equipment.
  • Further deployment of liquidity following the $458 million convertible note offering.
  • Completion of the wind down of the Bitcoin position and changes in the remaining 1,861 BTC balance.
  • Progress of the Sherbrooke project following the conditional agreement for 96 MW of existing capacity.

Balance sheet and cash flow

  • The Company raised $458 million via a convertible note offering during the quarter.
  • As of August 7, 2026, the Company had a total liquidity of approximately $819 million comprising approximately $698 million in unrestricted cash and approximately $121 million in unencumbered Bitcoin.
  • The Company sold 1,085 Bitcoin for $75 million in proceeds during the period beginning April 1, 2026, and ending August 7, 2026.
  • As of August 7, 2026 the Company’s Bitcoin balance stands at 1,861 BTC.

Analysis

Keel's reported continuing legacy operations weakened substantially in the second quarter. Revenue was $30 million, down 50% year over year, which the Company attributed to a lower average Bitcoin price and the April shutdown of Moses Lake cryptocurrency mining operations in the U.S. The operating result moved to a $141 million loss from operating income of $11 million in Q2 2025, while loss from continuing operations was $64 million compared with income from continuing operations of $13 million in Q2 2025. Adjusted EBITDA was negative $24 million, down from $7 million in Q2 2025.

The cost profile reflects Keel's transition from Bitcoin mining toward HPC infrastructure development. General and administrative expenses were $31 million versus $19 million in Q2 2025, driven by hiring of senior subject-matter experts for the project-management phase. The reported operating loss included non-cash depreciation of $84 million, compared with $26 million of non-cash depreciation included in Q2 2025 operating income. The release also states that Latin American assets are classified as discontinued operations and that continuing operations refer to the North American portfolio.

Operational activity centered on advancing the three priority development sites. Keel reported zoning and land-development approvals at Panther Creek and Sharon, progressing environmental permit applications across all three sites, first Vertiv module delivery at Moses Lake, additional long-lead-time deliveries at Sharon and Moses Lake, and final fiber-contract execution across the sites. It also completed decommissioning of all U.S. Bitcoin mining operations in preparation for HPC construction. Management described active negotiations with prospective tenants and stated that the priority sites are nearing full permitting.

Capital resources were the major offset to weak legacy financial results. The Company raised $458 million through a convertible note offering and reported approximately $819 million of liquidity as of August 7, 2026, including approximately $698 million of unrestricted cash and approximately $121 million of unencumbered Bitcoin. Keel also sold 1,085 Bitcoin for $75 million in proceeds as part of the planned Bitcoin wind down, leaving 1,861 BTC as of August 7, 2026. The release provided no quantitative financial outlook, so the next evidence points are permitting completion, customer agreements, construction financing, and conversion of the development pipeline into operating data-center capacity.

Management, verbatim

Power is the constraint. Everything else is downstream of it. Eighteen months ago, we positioned the Company around this thesis, and today all three of our priority sites are nearing full permitting with multiple prospective tenants negotiating for each one.

Ben Gagnon, CEO

With $819 million of liquidity and uncommitted 2027 capacity across PJM and Washington, we are negotiating from a position of strength.

Ben Gagnon, CEO

We are better capitalized today than at any point in our Company's history.

Jonathan Mir, CFO

Not in the filing

stated, not guessed
  • Gross profit and gross margin were not reported.
  • Operating expenses other than general and administrative expenses were not reported.
  • Total net income or loss, including discontinued operations, was not reported.
  • Non-GAAP EPS was not reported.
  • Operating cash flow was not reported.
  • Free cash flow was not reported.
  • Capital expenditures were not reported.
  • Debt balance and convertible-note principal amount were not reported.
  • Share repurchases and dividends were not reported.
  • Segment revenue was not reported.
  • Prior-quarter values and quarter-over-quarter changes for reported financial metrics were not reported.
  • Prior-year revenue amount was not reported.
  • Percentage changes for general and administrative expenses, operating loss, loss from continuing operations, EPS, and non-cash depreciation were not reported.
  • Quantitative forward guidance for revenue, gross margin, operating expenses, tax rate, or other financial measures was not reported.
  • Previous-quarter outlook was not provided.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Questions about KEEL earnings dates

When is Keel Infrastructure's next earnings date?
AlphAI has no date for KEEL yet. We do not publish estimates, so this page shows a date the day we have one.
Why is there sometimes no date?
AlphAI leaves out estimates. Many sites fill the gap by adding about 91 days to the last report, but that arithmetic is a guess, and a wrong date costs a reader more than a missing one, so we show nothing until a date is set, and a company can still move it. Every quarter already on this page is read straight from the SEC filing: an 8-K item 2.02 for US filers, a 6-K earnings release for foreign private issuers.