$LEU earnings report

Centrus Reports Third Quarter 2026 Results. AlphAI read Centrus Energy's Third Quarter 2026 filing as mixed. 2 quarters are on record below.

Third Quarter 2026

AlphAI · Earnings readLEU · Third Quarter 2026 · ended September 30, 2026

Centrus Reports Third Quarter 2026 Results

→Mixed quarter

Third-quarter revenue declined 26% and gross loss widened to $10.6 million, while GAAP net income rose to $31.6 million primarily because of a $46.4 million gain on the change in fair value of warrant liability. The company expanded its enrichment backlog and advanced centrifuge manufacturing and supply-chain milestones ahead of its year-end targets.

Revenue
$55.5M
decrease of $19.4 million or 26% y/y
LEU segment
$31.8M
decrease of $13.0 million or 29% y/y
EPS · non-GAAP
$0.46
Full year 2026 outlook
$450 million to $500 million

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Total revenue, three months ended September 30, 2026GAAP$55.5M–decrease of $19.4 million or 26%
Separative work units revenue, three months ended September 30, 2026GAAP$14.1M––
Uranium revenue, three months ended September 30, 2026GAAP$17.7M––
Technical solutions revenue, three months ended September 30, 2026GAAP$23.7M––
Total cost of sales, three months ended September 30, 2026GAAP$66.1M––
Gross loss, three months ended September 30, 2026GAAP$10.6M–increase of $6.3 million or 147%
Advanced technology costs, three months ended September 30, 2026GAAP$4.7M––
Selling, general and administrative expense, three months ended September 30, 2026GAAP$13.2M––
Amortization of intangible assets, three months ended September 30, 2026GAAP$1.2M––
Operating loss, three months ended September 30, 2026GAAP$29.7M––
Investment income, three months ended September 30, 2026GAAP$16.9M––
Gain on change in fair value of warrant liability, three months ended September 30, 2026GAAP$46.4M––
Net income, three months ended September 30, 2026GAAP$31.6M–increase of $27.7 million or 710%
Basic net income per share, three months ended September 30, 2026GAAP$1.53––
Diluted net income per share, three months ended September 30, 2026GAAP$1.41––
Adjusted operating loss, three months ended September 30, 2026non-GAAP$24M––
Adjusted net loss, three months ended September 30, 2026non-GAAP$9.4M––
Adjusted basic net loss per share, three months ended September 30, 2026non-GAAP$0.46––
Adjusted diluted net loss per share, three months ended September 30, 2026non-GAAP$0.46––
Total revenue, nine months ended September 30, 2026GAAP$308.3M––
Gross profit, nine months ended September 30, 2026GAAP$70.8M––
Operating loss, nine months ended September 30, 2026GAAP$18.5M––
Net income, nine months ended September 30, 2026GAAP$58.4M––
Diluted net income per share, nine months ended September 30, 2026GAAP$2.63––
Adjusted operating income, nine months ended September 30, 2026non-GAAP$32.9M––
Adjusted net income, nine months ended September 30, 2026non-GAAP$52.8M––
Adjusted diluted net income per share, nine months ended September 30, 2026non-GAAP$2.37––

Segments

SegmentRevenueq/qy/y
LEU segmentUranium revenue decreased by $16.4 million quarter over quarter, primarily attributable to a decrease in the volume of uranium sold. SWU revenue increased by $3.4 million as a result of a 19% increase in volume of SWU sold and a 10% increase in average price of SWU sold.$31.8M–decrease of $13.0 million or 29%
Technical Solutions segmentThe decrease in revenue was primarily attributable to a $10.2 million decrease in revenue generated by the HALEU Operation Contract, while the remaining change was related to other contracts.$23.7M–decrease of $6.4 million or 21%

Full year 2026 outlook

  • Revenue$450 million to $500 million
  • NoteTotal capital deployment: $350 million to $500 million, driven by increased investment in the Company’s industrial build out related to its centrifuge manufacturing
  • NoteHire at least 100 net new employees for its Oak Ridge, Tennessee, facility
  • NoteHire at least 175 net new employees for its Piketon, Ohio, facility up from 100 net new employee hires

What drove it

  • Backlog across both segments was $7.0 billion as of September 30, 2026 and extends to 2040.
  • LEU segment backlog was approximately $6.2 billion, including approximately $5.4 billion in contingent LEU and HALEU sales commitments and $5.1 billion under definitive agreements.
  • The company completed manufacturing of its first centrifuge, finalized contracts with all supply-chain deemed critical, and completed its first certified-for-construction package ahead of year-end targets.
  • The company began shipping centrifuges from Oak Ridge, Tennessee, and is enriching HALEU for the commercial market from the existing 16-centrifuge cascade.
  • The company cited commercial and operational synergies and business-model diversification from its acquisition of Westerman.

Concerns

  • The current DOE budget proposed for fiscal year 2027 does not include further funding for operation of the HALEU cascade under the HALEU Operation Contract, which represents approximately $0.8 billion of Technical Solutions backlog.
  • DOE has communicated that it does not currently intend to exercise further options under the HALEU Operation Contract.
  • Technical Solutions gross margin was a loss of $3.7 million, compared with profit of $3.5 million in the prior-year quarter, primarily attributable to the HALEU Operation Contract.
  • LEU customers generally have multi-year contracts with annual, rather than quarterly, purchase commitments, and LEU gross loss varies based on the timing and composition of contracts.
  • Third-quarter GAAP net income included a $46.4 million gain from the fair value adjustment of warrant liabilities.

What to watch

  • Delivery execution against full-year total revenue guidance of $450 million to $500 million.
  • Total capital deployment against the $350 million to $500 million full-year outlook.
  • Funding and option decisions affecting the HALEU Operation Contract and the approximately $0.8 billion Technical Solutions backlog associated with it.
  • Hiring progress toward at least 100 net new Oak Ridge employees and at least 175 net new Piketon employees.
  • Progress scaling centrifuge manufacturing and shipments from Oak Ridge to Piketon.
  • Operational milestone achievement tied to contingent LEU and HALEU sales commitments.

Balance sheet and cash flow

  • Cash (used in) operating activities for the nine months ended September 30, 2026: $11.1 million
  • Capital expenditures for the nine months ended September 30, 2026: $226.4 million
  • Cash used in investing activities for the nine months ended September 30, 2026: $226.4 million
  • Cash provided by financing activities for the nine months ended September 30, 2026: $547.0 million
  • Proceeds from the issuance of common stock, pre-funded warrants, and common warrants, net: $493.8 million
  • Cash and cash equivalents as of September 30, 2026: $2,236.1 million
  • Cash, cash equivalents and restricted cash as of September 30, 2026: $2,269.4 million
  • Long-term debt as of September 30, 2026: $1,178.8 million
  • Total assets as of September 30, 2026: $2,871.6 million
  • Total liabilities as of September 30, 2026: $1,766.5 million
  • Total stockholders’ equity as of September 30, 2026: $1,105.1 million

Analysis

Centrus reported third-quarter revenue of $55.5 million, down from $74.9 million in the prior-year quarter. The LEU segment declined to $31.8 million as uranium revenue fell by $16.4 million quarter over quarter because of lower uranium volume, partly offset by a $3.4 million increase in SWU revenue. Technical Solutions revenue declined to $23.7 million, primarily due to a $10.2 million reduction in revenue from the HALEU Operation Contract.

Profitability weakened at the gross-profit level. The company recorded gross loss of $10.6 million, compared with gross loss of $4.3 million a year earlier. LEU gross loss improved to $6.9 million from $7.8 million, while Technical Solutions moved to a gross-margin loss of $3.7 million from gross-margin profit of $3.5 million, primarily because of the HALEU Operation Contract. Advanced technology costs rose to $4.7 million and selling, general and administrative expense rose to $13.2 million, producing a GAAP operating loss of $29.7 million.

GAAP net income increased to $31.6 million from $3.9 million, but the primary driver was a $46.4 million gain on the change in fair value of warrant liability, along with a $4.0 million increase in investment income. On an adjusted basis, the company reported a net loss of $9.4 million, compared with adjusted net income of $5.2 million in the prior-year quarter. The contrast between GAAP and adjusted results is central to the quarter because the reported GAAP profit did not arise from gross-margin expansion or operating income.

The company continued substantial investment in expansion. For the first nine months, cash used in operating activities was $11.1 million and capital expenditures were $226.4 million. Financing activities provided $547.0 million, including $493.8 million from the issuance of common stock, pre-funded warrants, and common warrants. Cash and cash equivalents were $2,236.1 million at September 30, 2026, while long-term debt was $1,178.8 million.

Operationally, Centrus reported completion of first-centrifuge manufacturing, critical supply-chain contracts, and its first certified-for-construction package ahead of year-end targets. Backlog totaled $7.0 billion and extended to 2040, although the proposed fiscal year 2027 DOE budget does not include further funding for operation of the HALEU cascade under the HALEU Operation Contract, representing approximately $0.8 billion of Technical Solutions backlog. Full-year revenue guidance is $450 million to $500 million, alongside total capital deployment of $350 million to $500 million as the company scales centrifuge manufacturing and related industrial buildout.

Management, verbatim

The third quarter’s continued execution across all facets of our business primed Centrus to achieve a critical milestone: shipping the first new centrifuge to support our commercial-scale expansion.

Amir Vexler, President and CEO

This achievement, along with us demonstrating that we have a complete manufacturing supply chain in place, was reached two months ahead of our ambitious schedule and puts us far ahead of the competition.

Amir Vexler, President and CEO

We are now focused on scaling up our supply chain as we begin manufacturing and shipping more centrifuges from Oak Ridge to Piketon.

Amir Vexler, President and CEO

Not in the filing

stated, not guessed
  • Previous-release outlook was not provided, so no comparison of reported results with prior guidance is available.
  • Gross margin percentage was not reported.
  • Free cash flow was not reported.
  • Quarterly operating cash flow was not reported.
  • Quarterly capital expenditures were not reported.
  • Share repurchases were not reported.
  • Dividends were not reported.
  • Guidance for gross margin, operating expenses, tax rate, EPS, net income, operating cash flow, and free cash flow was not reported.
  • Prior-quarter comparatives for reported third-quarter financial metrics were not reported.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Second Quarter 2026

AlphAI · Earnings readLEU · Second Quarter 2026 · ended June 30, 2026

Revenue of $176.1 million, compared to revenue of $154.5 million in Q2 2025; GAAP net income of $16.8 million and non-GAAP adjusted net income of $38.7 million.

→Mixed quarter

Revenue and adjusted net income increased year over year, supported by LEU segment growth and uranium revenue, while GAAP net income, total gross profit, and Technical Solutions results declined. The FY 2027 DOE budget proposal also omits further HALEU cascade operating funding.

Revenue
$176M
increase of $21.6 million (or 14%) y/y
LEU
$153M
increase of $27.7 million (or 22%) y/y
EPS · non-GAAP
$1.77 (diluted) per common share
full year 2026 outlook
$450 million to $500 million

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Total revenueGAAP$176.1M–increase of $21.6 million (or 14%)
LEU segment revenueGAAP$153.4M–increase of $27.7 million (or 22%)
Technical Solutions segment revenueGAAP$22.7M–decrease of $6.1 million (or 21%)
Uranium revenueGAAP$53.4M––
LEU segment cost of salesGAAP$101.8M–increase of $26.8 million (or 36%)
Technical Solutions segment cost of salesGAAP$24.4M–decrease of $1.2 million (or 5%)
Gross profitGAAP$49.9M–decrease of $4.0 million (or 7%)
LEU segment gross profitGAAP$51.6M–increase of $0.9 million (or 2%)
Technical Solutions segment gross profit (loss)GAAPloss of $1.7 million–decrease of $4.9 million (or 153%)
Net incomeGAAP$16.8M–decrease of $12.1 million (or 42%)
Basic earnings per common shareGAAP$0.85 (basic) per common share––
Diluted earnings per common shareGAAP$0.77 (diluted) per common share––
Adjusted net incomenon-GAAP$38.7M––
Adjusted basic EPSnon-GAAP$1.95 (basic) per common share––
Adjusted diluted EPSnon-GAAP$1.77 (diluted) per common share––
Backlog across both segmentsother$4.5B––
LEU segment backlogotherapproximately $3.7 billion––
Technical Solutions segment backlogotherapproximately $0.8 billion––

Segments

SegmentRevenueq/qy/y
LEUThe Company had uranium revenue of $53.4 million. SWU revenue decreased by $25.7 million as a result of a 23% decrease in the volume of SWU sold, partially offset by a 3% increase in the average price of SWU sold.$153.4M–increase of $27.7 million (or 22%)
Technical SolutionsThe decrease in revenue was primarily attributable to a $5.9 million decrease in revenue generated by the HALEU Operation Contract with the Department of Energy, while the remaining change was related to other contracts.$22.7M–decrease of $6.1 million (or 21%)

full year 2026 outlook

  • Revenue$450 million to $500 million
  • NoteTotal capital deployment to be in the range of $350 million to $500 million, driven by increased investment in the Company’s industrial build out related to its centrifuge manufacturing
  • NoteFinalize contracts with all partners identified as critical to its industrial build out
  • NoteHire at least 100 net new employees for its Oak Ridge, Tennessee, facility
  • NoteHire at least 175 net new employees for its Piketon, Ohio, facility up from 100 net new employee hires
  • NoteRelease a Certified for Construction package
  • NoteComplete its first centrifuge in Oak Ridge, Tennessee

What drove it

  • Total revenue increased by $21.6 million (or 14%), led by a $27.7 million increase in LEU segment revenue.
  • Uranium revenue was $53.4 million, while SWU revenue decreased by $25.7 million because the volume of SWU sold declined 23%, partly offset by a 3% increase in average SWU selling price.
  • LEU segment gross profit increased by $0.9 million (or 2%), primarily due to the change in the composition of contracts quarter over quarter.
  • The Company signed a $900 million HALEU Enrichment award contract with the U.S. Department of Energy.
  • The Company signed a first-of-a-kind, large-scale commercial HALEU supply agreement that potentially includes prepayments.
  • Contingent LEU and HALEU sales commitments were approximately $3.0 billion, of which $2.4 billion were under definitive agreements, in support of potential construction of LEU and HALEU production capacity at the Piketon, Ohio facility.

Concerns

  • Technical Solutions revenue declined by $6.1 million (or 21%), primarily due to a $5.9 million decrease in HALEU Operation Contract revenue.
  • Technical Solutions gross profit (loss) was a loss of $1.7 million, compared with profit of $3.2 million in the prior-year period.
  • Net income decreased by $12.1 million (or 42%), primarily reflecting increases in selling, general, and administrative costs, advanced technology costs, and lower gross profit.
  • Selling, general, and administrative costs increased $12.8 million, driven by a $17.2 million increase in stock-compensation expense related to non-employee tax withholdings of RSUs.
  • Advanced technology costs increased by $7.5 million.
  • The current DOE budget proposed for fiscal year 2027 does not include further funding for operation of the HALEU cascade under the HALEU Operation Contract, which represents approximately $0.8 billion of Technical Solutions backlog. DOE also communicated that it does not currently intend to exercise further options under that contract.
  • Guidance assumes no significant change in restrictions on the Company’s ability to receive and sell Russian LEU or other uranium products, no significant economic disruptions or downturns, successful implementation of planned expansion projects, and ongoing continuation of current business operations.

What to watch

  • Execution against full-year 2026 total revenue guidance of $450 million to $500 million.
  • Execution against total capital deployment guidance of $350 million to $500 million for centrifuge-manufacturing industrial buildout.
  • Completion of the first centrifuge in Oak Ridge, Tennessee, and release of a Certified for Construction package.
  • Hiring of at least 100 net new employees at Oak Ridge, Tennessee, and at least 175 net new employees at Piketon, Ohio.
  • Finalization of contracts with all partners identified as critical to the industrial build out.
  • DOE funding and option decisions for the HALEU Operation Contract.

Analysis

Centrus reported second-quarter 2026 revenue of $176.1 million, up $21.6 million (or 14%) from $154.5 million in the prior-year period. LEU segment revenue increased $27.7 million (or 22%) to $153.4 million, aided by $53.4 million of uranium revenue. This more than offset a $6.1 million (or 21%) decline in Technical Solutions revenue to $22.7 million, principally due to a $5.9 million reduction in revenue from the HALEU Operation Contract.

Profitability was weaker on a GAAP basis despite the revenue increase. Total gross profit declined $4.0 million (or 7%) to $49.9 million. LEU segment gross profit rose $0.9 million (or 2%) to $51.6 million, but Technical Solutions shifted to a loss of $1.7 million from profit of $3.2 million. The company said LEU profitability reflected a change in the composition of contracts quarter over quarter, while the Technical Solutions decline was primarily attributable to the HALEU Operation Contract.

GAAP net income fell $12.1 million (or 42%) to $16.8 million. The release attributed the decline to a $12.8 million increase in selling, general, and administrative costs, including a $17.2 million increase in stock-compensation expense related to non-employee tax withholdings of RSUs, a $7.5 million increase in advanced technology costs, and lower gross profit. These factors were partly offset by an $8.3 million increase in investment income and a $3.7 million decrease in income tax expense. Non-GAAP adjusted net income increased to $38.7 million from $34.5 million.

Commercial and industrial-buildout activity expanded the company’s stated backlog to $4.5 billion extending to 2040, including approximately $3.7 billion in the LEU segment and approximately $0.8 billion in Technical Solutions. Centrus highlighted a $900 million HALEU Enrichment award contract with DOE and approximately $3.0 billion in contingent LEU and HALEU sales commitments, including $2.4 billion under definitive agreements. The key backlog risk is that the proposed fiscal year 2027 DOE budget does not include further HALEU cascade operating funding, while DOE does not currently intend to exercise further options under the HALEU Operation Contract.

For full-year 2026, Centrus expects total revenue of $450 million to $500 million and total capital deployment of $350 million to $500 million. Operational priorities include critical-partner contracts, expanded Oak Ridge and Piketon hiring, a Certified for Construction package, and completion of the first Oak Ridge centrifuge. The company increased Piketon hiring guidance to at least 175 net new employees from 100 net new employee hires, underscoring the planned scale-up of its enrichment buildout.

Management, verbatim

This was another strong quarter of financial and operational progress for Centrus that included a number of commercial wins for our future enrichment business as we capitalize on strong industry tailwinds and our operational momentum.

Amir Vexler, Centrus Energy President and CEO

In general, we continue to see healthy demand momentum with consistent constrained supply, resulting in upward pressure on SWU prices.

Amir Vexler, Centrus Energy President and CEO

Not in the filing

stated, not guessed
  • Prior-quarter revenue, segment revenue, costs of sales, gross profit, net income, and EPS comparisons
  • GAAP operating income or loss
  • GAAP operating expenses as a total
  • Gross margin
  • Prior-year GAAP basic and diluted EPS
  • Prior-year non-GAAP adjusted basic and diluted EPS
  • Non-GAAP reconciliation details in the filing text provided
  • Operating cash flow
  • Free cash flow
  • Cash and cash equivalents
  • Debt
  • Share repurchases
  • Dividends
  • Tax rate
  • Prior outlook for comparison

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Questions about LEU earnings dates

When is Centrus Energy's next earnings date?
AlphAI has no date for LEU yet. We do not publish estimates, so this page shows a date the day we have one.
Why is there sometimes no date?
AlphAI leaves out estimates. Many sites fill the gap by adding about 91 days to the last report, but that arithmetic is a guess, and a wrong date costs a reader more than a missing one, so we show nothing until a date is set, and a company can still move it. Every quarter already on this page is read straight from the SEC filing: an 8-K item 2.02 for US filers, a 6-K earnings release for foreign private issuers.