Sigma Lithium reports 3Q 26 gross revenues of US$22.3 million and a 32% net revenue margin; 9M 26 gross revenues up 20% to US$115.4 million; US$125 million convertible bond announced to repay Synergy prepayment. AlphAI read Sigma Lithium's Q3 FY2026 filing as mixed. 3 quarters are on record below.

Q3 FY2026

AlphAI · Earnings readSGML · Q3 2026 · ended 2026-09-30

Sigma Lithium reports 3Q 26 gross revenues of US$22.3 million and a 32% net revenue margin; 9M 26 gross revenues up 20% to US$115.4 million; US$125 million convertible bond announced to repay Synergy prepayment

→Mixed quarter

Quarterly gross revenues fell to US$22.3 million from US$51.0 million in 2Q 26, the company cites a temporary partial suspension of operations, and 3Q 26 operating loss was US$16.8 million. Nine-month figures show growth (gross revenues up 20%, operating cash flow US$51.3 million versus negative US$6.6 million in 9M 25) and the balance sheet was restructured, but net debt stood at US$105 million and the company reports a pro forma figure of US$145 million.

Revenue
$22.3M

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Gross revenues, 3Q 26other$22.3M––
Average realized price, 3Q 26otherUS$1,485/t––
Cost of sales, 3Q 26other$9.3M––
Gross profit, 3Q 26other$4.3M––
Net revenue margin, 3Q 26other32%––
Adjusted EBITDA, 3Q 26non-GAAPnegative US$6.7 million––
Operating loss, 3Q 26other$16.8M––
Operating cash flow, 3Q 26other$24.2M––
Gross revenues, 9M 26other$115.4M–up 20%
Net revenue margin, 9M 26other56.6%–tenfold improvement
Gross profit, 9M 26other$62.6M––
Adjusted EBITDA, 9M 26non-GAAP$35.7M––
Adjusted EBITDA margin, 9M 26non-GAAP32%––
Operating income, 9M 26other$4.5M––
Operating cash flow, 9M 26other$51.3M––
Production, 3Q 26other7,300 tonnes––
Production, 9M 26other66,300 tonnes––
Plant gate cost, 3Q 26otherUS$424/t––
Plant gate cost, 9M 26otherUS$418/t––
CIF cost, 3Q 26otherUS$518/t––
CIF cost, 9M 26otherUS$505/t––
All-In Sustaining Cost (AISC), 3Q 26 (pro forma)otherUS$642/tdown 4%–
Net debt, as of September 30, 2026other$105M––
Net debt, pro forma for convertible bondsother$145M––
Net debt to 9M 26 annualized operating cash flowother1.5x––
Cash position, as of September 30, 2026other$10M––
Short-term debt, pro forma for convertible bonds and Synergy repaymentother$19M–decreased by 85%

FY2027E and FY2026 (as reaffirmed or maintained in the release) outlook

  • NoteProduction for FY2027 reaffirmed at 330,000 tonnes, assuming only Cleantech Industrial Plant 1 is operating
  • NoteEstimated quarterly production in 2027 of 68,000 tonnes of high-grade lithium oxide concentrate plus 15,000 tonnes from reprocessing of tailings
  • NoteAISC guidance of US$668/t for 2026, maintained
  • NoteAISC guidance of US$620/t for FY27E, maintained
  • NoteCleantech Industrial Plant 1 expected to generate cash flow of US$125 million to US$290 million in FY27E at realized SC6 prices of US$1,000/t to US$1,500/t (pre-tax, pre-interest, pre-growth capex and pre-working capital)
  • NoteCleantech Industrial Plant 2 to add 250,000 tonnes of annual capacity to reach 580,000 tonnes per year; construction to resume in 2027
  • NoteCleantech Industrial Plant 3 to add 250,000 tonnes of annual capacity to reach 830,000 tonnes per year by 2028

Capital returns

  • No share repurchases or dividends are reported in the release.

What drove it

  • Company explanation: 3Q 26 gross revenues of US$22.3 million reflected lower volumes sold due to the temporary partial suspension of operations during the quarter.
  • Company explanation: the reduction in 3Q 26 cost of sales is presented alongside a decrease of 58%, with the release not stating the comparison period.
  • Company explanation: the move from FCA to CIF sales terms is cited as the reason CIF costs (US$518/t) are above plant gate costs (US$424/t).
  • Company explanation: the 3Q 26 AISC is presented on a pro forma basis, spreading 3Q 26 SG&A over a volume of 60,000 tonnes for the quarter, with all other components as reported.
  • Company explanation: operations fully resumed on October 5, 2026, with 11,000 tonnes of high-grade lithium oxide concentrate produced in early 4Q 26 through November 10, 2026.
  • Mine 1 South Pit new pit shell provides access to approximately 200,000 tonnes of lithium oxide concentrate, compared with approximately 100,800 tonnes under the previous pit shell, per the release.
  • Company states that the TAC Agreement with the State of Minas Gerais and the Federal Court of Appeals 'too big to stop' classification support its operating position.
  • Company explanation: reprocessing circuit at Cleantech Industrial Plant 1 enables recovery of lithium fines and intermediate products, supporting cash generation during the mining ramp-up.

Concerns

  • 3Q 26 operating loss of US$16.8 million and Adjusted EBITDA of negative US$6.7 million.
  • Gross revenues fell to US$22.3 million from US$51.0 million in 2Q 26.
  • Net debt of US$105 million, rising to US$145 million pro forma for the convertible bonds.
  • Synergy export prepayment represented approximately 80% of total debt as of October 2026 and is due June 2027 after extension.
  • Cash of US$10 million at September 30, 2026.
  • ANM improvement notice requiring reshaping of a slope in the depleted, non-operating North Pit; the release states it does not represent a stoppage.
  • Release notes the market prices for lithium may not remain at current levels and the EV market has limited market share, per forward-looking disclaimers.
  • Production of 7,300 tonnes in 3Q 26 is stated in the body text, while the highlights section refers to 7,000 tonnes of high-grade produced in 3Q 26; the basis difference is not explained in the release.

What to watch

  • Closing of the US$125 million convertible bond on or about November 16, 2026.
  • 4Q 26 volumes: 11,000 tonnes of high-grade lithium oxide concentrate produced through November 10, 2026, and inventory available for sale of 15,000 tonnes of high-purity lithium fines (high-grade equivalent) plus 6,000 tonnes of intermediate high-grade products.
  • Whether 4Q 26 AISC tracks the 2026 guidance of US$668/t, given 9M 26 AISC on a reported basis is not stated separately from the 3Q 26 pro forma figure of US$642/t.
  • Progress of the mining equipment upgrade (excavators from 75 to 105 tonnes, trucks from 60 to 75 tonnes) and the new South Pit pit shell.
  • Court-appointed expert calculation under the 'too big to stop' ruling and the ANM North Pit slope notice.
  • Synergy export prepayment maturity extended to June 2027.
  • FY27E production of 330,000 tonnes and FY27E AISC of US$620/t.
  • Resumption of Cleantech Industrial Plant 2 construction in 2027 and Plant 3 completion by 2028.

Balance sheet and cash flow

  • Priced US$125 million of 5-year convertible bonds due November 2031 on November 2, 2026, with closing expected on or about November 16, 2026; holders may require repayment around November 2029.
  • Convertible bond proceeds, per the release, fully repay the export prepayment agreement with Synergy (US$108.5 million, or US$97 million net of US$11 million cash held as collateral).
  • Pro forma short-term debt decreased by 85% to US$19 million, consisting of US$14.4 million of export prepayment trade finance and US$4.3 million of current BDMG debt.
  • Net debt of US$105 million as of September 30, 2026, equal to 1.5x the 9M 26 annualized operating cash flow of US$68 million; pro forma net debt of US$145 million.
  • The Synergy export prepayment, representing approximately 80% of total debt as of October 2026, was extended to June 2027 in 4Q 26 (before the convertible bond repayment).
  • Cash of US$10 million as of September 30, 2026, plus US$2 million in receivables expected to be collected after quarter-end.
  • Potential post period-end liquidity sources cited: high-grade sales of approximately US$10 million, unsold lithium fines inventory of approximately US$20 million, and the remaining US$32 million of installments under the previously announced US$96 million offtake agreement.
  • Cleantech Industrial Plant 2 is fully funded by a BRL 492 million long-term expansion loan from BNDES against a budgeted capex of BRL 492 million, with 16-year maturity, 18-month amortization grace period and a 7.53% interest rate in BRL (an estimated 2.5% in USD-equivalent terms).

Analysis

Sigma Lithium reported 3Q 26 gross revenues of US$22.3 million, down from US$51.0 million in 2Q 26, and an operating loss of US$16.8 million. The company attributes the lower revenue to lower volumes sold during a temporary partial suspension of operations. Despite the quarterly decline, the release reports a 32% net revenue margin, gross profit of US$4.3 million and operating cash flow of US$24.2 million, against US$1.6 million in 3Q 25. Adjusted EBITDA for the quarter was negative US$6.7 million. Average realized price was US$1,485/t, and the release reports plant gate costs of US$424/t, CIF costs of US$518/t, and a pro forma AISC of US$642/t, down 4% from US$668/t in 2Q 26.

On a nine-month basis, gross revenues reached US$115.4 million, up 20% from 9M 25. The net revenue margin was 56.6%, against 5.6% in 9M 25, and gross profit was US$62.6 million. Adjusted EBITDA was US$35.7 million at a 32% margin, operating income was US$4.5 million, and operating cash flow was US$51.3 million, compared with negative US$6.6 million in 9M 25. Nine-month production was 66,300 tonnes, with 7,300 tonnes produced in 3Q 26.

On the balance sheet, the company announced a US$125 million five-year convertible bond to repay the Synergy export prepayment (US$108.5 million gross, US$97 million net of cash collateral). The release says pro forma short-term debt falls 85% to US$19 million. Net debt was US$105 million at September 30, 2026, equal to 1.5x the 9M 26 annualized operating cash flow of US$68 million, and rises to US$145 million pro forma for the convertible bonds. Cash was US$10 million at quarter end, and the release lists potential additional liquidity from high-grade sales, lithium fines inventory and the remaining offtake installments.

On guidance, the company reaffirmed 330,000 tonnes of production for FY27 from Cleantech Industrial Plant 1 alone, maintained AISC guidance of US$668/t for 2026 and US$620/t for FY27E, and gave a FY27E cash flow range of US$125 million to US$290 million at realized SC6 prices of US$1,000/t to US$1,500/t. Plant 2 (580,000 tpy) is described as fully funded by a BRL 492 million BNDES loan, and Plant 3 (830,000 tpy) is targeted for 2028. The release contains no prior-period guidance comparison in the documents provided.

The figures that deserve most attention are the quarterly revenue decline and operating loss against the nine-month growth, the step-up in net debt on a pro forma basis, and the concentration of debt in the Synergy prepayment with its June 2027 maturity. The release also reports an ANM improvement notice on the North Pit and states that the 'too big to stop' ruling leaves a court-appointed expert to quantify impacts. The release does not provide a consensus or share-price reaction, so the read stops at the reported figures.

Not in the filing

stated, not guessed
  • Prior-year gross revenues for 3Q 25 and 9M 25 (only the 9M growth percentage is printed).
  • Prior-year figures for 3Q 25 gross profit, cost of sales, Adjusted EBITDA, operating loss and net revenue margin.
  • Comparison period for the 'decreased by 58%' cost of sales change.
  • Prior-quarter values for gross profit, Adjusted EBITDA, operating loss, net revenue margin and operating cash flow in 2Q 26.
  • Prior-quarter figure for net revenue margin in 2Q 26.
  • Prior-year net debt, cash and total debt comparisons.
  • Reported (non-pro forma) 9M 26 AISC figure.
  • Segment breakdown of revenue (the release does not report segments).
  • Net income, EPS, income tax and interest expense.
  • Total assets, total equity and capital expenditure totals for the period.
  • Executive quotes attributed to named speakers.
  • Basis of the 3Q 26 production figure (7,300 tonnes in body text versus 7,000 tonnes of high-grade in highlights).

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Q3 FY2026

AlphAI · Earnings readSGML · Q3 2026 · ended September 30, 2026

Sigma Lithium previews 3Q 26 earnings with 32% gross margin, US$518/t CIF China cash cost and production affected by an operational suspension.

→Mixed quarter

The Company preserved a 32% gross margin and reduced CIF China cash cost year over year, but production was reduced by operational stoppages, gross revenues declined 23%, and cash and equivalents were US$10M at period end.

Revenue
$23M
23% decrease from 3Q 25 y/y
Gross margin · other
32%

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Production Volumes, 3Q 26other7,293t––
Operating Cash Cost (Plant Gate), 3Q 26otherUS$424/t6% increase over 2Q 26In line with 3Q 25
Operating Cash Cost (CIF China), 3Q 26otherUS$518/t15% increase over 2Q 265% lower than 3Q 25
Gross Revenues, 3Q 26other$23M–23% decrease from 3Q 25
Gross Margin, 3Q 26other32%––
Cash and Cash Equivalents (period end), 3Q 26other$10M––
Total Debt (period end), 3Q 26other$125MIn line with 2Q 2623% lower than 3Q 25
Total net debt, September 30, 2026other$125M––
Cash inflows, 3Q 26other$19M––
Operating costs and capex, 3Q 26other$26M––
Senior Secured Debt agreement principal and interest, September 30, 2026other$97M––

Estimated 12 Month Period (Plant 1), Estimated FY 2027 (Plant 1), Estimated Plants 1 & 2 and Estimated Plants 1, 2 & 3 outlook

  • NoteProduction Volumes: 240,000t over the next 12 months
  • NoteProduction Volumes: 330,000t in FY27 from Plant 1
  • NoteProduction Volumes: 580,000t, Estimated Plants 1 & 2
  • NoteProduction Volumes: 830,000t, Estimated Plants 1, 2 & 3
  • NoteCIF China Cash Cost as of 3Q 26: ($518) for the Estimated 12 Month Period (Plant 1), Estimated FY 2027 (Plant 1), Estimated Plants 1 & 2 and Estimated Plants 1, 2 & 3
  • NoteAll-In Sustaining Cost Guidance as of 2Q 26: ($668) for the Estimated 12 Month Period (Plant 1)
  • NoteAll-In Sustaining Cost Guidance as of 2Q 26: ($668) for Estimated FY 2027 (Plant 1)
  • NoteAll-In Sustaining Cost Guidance as of 2Q 26: ($620) for Estimated Plants 1 & 2
  • NoteAll-In Sustaining Cost Guidance as of 2Q 26: ($610) for Estimated Plants 1, 2 & 3
  • NoteFY26 AISC guidance: US$668/t, reduced by 6% from US$710/t
  • NoteFY27 AISC guidance: US$620/t maintained

What drove it

  • Production of 7,293 tonnes of lithium oxide concentrate was impacted by a suspension of operations by local authorities during the quarter.
  • The Company maintained positive gross margin through cost discipline despite the stoppage of operations during the quarter.
  • CIF China cash cost was 5% lower than 3Q 25 despite a much lower production volume.
  • Production restarted in early 4Q 26 after State and Federal Courts granted protection of operating and mining licenses.
  • Since restarting production, the Company produced 9,000 tonnes of high-grade concentrate in 4Q 26 to October 30, 2026.
  • A further 21,000 tonnes of additional inventory from 3Q 26 is available for sale in 4Q 26, comprising 15,000 tonnes of low-grade material and 6,000 tonnes of intermediate products.

Concerns

  • Gross revenues decreased 23% from 3Q 25 to US$23M.
  • Production was reduced by operational stoppages by local authorities during the quarter.
  • Operating cash cost increased 6% over 2Q 26 and CIF China cash cost increased 15% over 2Q 26.
  • Cash and equivalents were US$10M at September 30, 2026.
  • The timing and value of potential short-term liquidity inflows will depend on the timing of sales and prevailing lithium prices.
  • The proceedings concerning operating and mining licenses remain before the Brazilian judiciary.
  • The reported results are preliminary and unaudited and remain subject to completion of the quarter-end closing. Actual results may differ from these preliminary estimates.

What to watch

  • The Company expects to release its full third quarter 2026 results on November 11, 2026.
  • Sales of the 21,000 tonnes of 3Q 26 additional inventory available for sale in 4Q 26.
  • Progress toward 240,000 tonnes of production over the next 12 months and 330,000 tonnes in FY27 from Plant 1.
  • Execution against FY26 AISC guidance of US$668/t and FY27 AISC guidance of US$620/t.
  • The June 2027 maturity of debt under the Senior Secured Debt agreement.
  • The outcome of ongoing proceedings before the Brazilian judiciary regarding operating and mining licenses.
  • Plant 1 returning to industrial production cadence in 2027.

Balance sheet and cash flow

  • Cash and cash equivalents were US$10M at September 30, 2026.
  • Cash excludes US$2 million in receivables from lithium materials sold, outstanding at September 30, 2026.
  • Cash inflows of US$19 million, including prepaid installments on high-grade sales, were more than offset by operating costs and capex, which totaled US$26 million.
  • Potential sources of short-term liquidity after September 30, 2026, total up to US$62 million, comprising US$10 million in receivables from high-grade sales, US$20 million in unsold low-grade inventory, and US$32 million in outstanding installments under the US$96 million offtake agreement.
  • Total net debt was US$125 million at September 30, 2026, including the US$97 million in principal and interest under the Senior Secured Debt agreement with Synergy Capital.
  • On October 23, 2026, the Company extended the maturity of the debt under the Senior Secured Debt agreement to June 2027 from December 2026.
  • Short-term debt decreased by approximately 78%, from US$125M to US$28M.
  • Total debt was reduced by approximately 40% over two years, to US$125M on October 21, 2026.
  • The Company repaid more than US$90M in debt since 2Q 24, through cash generation.

Analysis

Sigma Lithium reported selected preliminary, unaudited 3Q 26 results for the quarter ended September 30, 2026. Production was 7,293t of lithium oxide concentrate, with operations affected by a suspension by local authorities. Gross revenues were US$23M, down 23% from US$30M in 3Q 25. The Company nevertheless reported a 32% gross margin, attributing the result to cost discipline despite the operational stoppage and lower volumes.

Cost performance was favorable against the prior-year period but weaker sequentially. Plant gate operating cash cost was US$424/t, in line with 3Q 25 and 6% higher than US$401/t in 2Q 26. CIF China cash cost was US$518/t, 5% lower than US$543/t in 3Q 25 but 15% higher than US$452/t in 2Q 26. The Company reduced FY26 AISC guidance by 6% to US$668/t from US$710/t and maintained FY27 AISC guidance of US$620/t.

Liquidity remained constrained at the reported period end. Cash and cash equivalents were US$10M, while cash inflows of US$19 million during the quarter were more than offset by US$26 million of operating costs and capex. The Company identified up to US$62 million in potential short-term liquidity from receivables, unsold low-grade inventory and outstanding offtake installments, while noting that timing and value depend on sales timing and prevailing lithium prices. Total debt was US$125M, 23% lower than 3Q 25 and in line with 2Q 26, and the Senior Secured Debt maturity was extended to June 2027 from December 2026.

Operations restarted in early 4Q 26 after the Company received court protection for its operating and mining licenses, though proceedings remain before the Brazilian judiciary. The Company reported 9,000 tonnes of high-grade concentrate produced in 4Q 26 through October 30, 2026, and stated that a further 21,000 tonnes of 3Q 26 inventory is available for sale in 4Q 26. Its outlook calls for 240,000 tonnes over the next 12 months and 330,000 tonnes in FY27 from Plant 1. The central execution items are conversion and sale of inventory, restoration of production cadence, delivery of the stated cost guidance, and legal continuity of operations.

Not in the filing

stated, not guessed
  • Accounting standard, including IFRS or local GAAP, was not stated.
  • Net income or loss was not reported.
  • Operating income or loss was not reported.
  • GAAP EPS was not reported.
  • Non-GAAP or adjusted EPS was not reported.
  • GAAP gross profit was not reported.
  • Operating cash flow was not reported.
  • Free cash flow was not reported.
  • Capital returns, including share repurchases and dividends, were not reported.
  • Gross margin prior-year and prior-quarter values were not reported.
  • Gross revenues prior-quarter value was not reported.
  • Production volume prior-year and prior-quarter values and changes were not reported.
  • Cash and cash equivalents prior-year and prior-quarter values and changes were not reported.
  • Tax rate was not reported.
  • Revenue guidance was not reported.
  • Gross-margin guidance was not reported.
  • Operating-expense guidance was not reported.
  • No previous release outlook was provided for comparison with reported results.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Q2 FY2026

AlphAI · Earnings readSGML · Q2 2026 · ended June 30, 2026

SIGMA LITHIUM ANNOUNCES RECORD 2Q 26 RESULTS: EBITDA MARGIN OF 47%, DECREASE OF OVER 30% IN COSTS; TAC AGREEMENT NEGOTIATIONS UNDERWAY

→Mixed quarter

The Company reported record US$55 million net revenues, a record 47% EBITDA margin, 60% gross margin, 32% operating margin and lower costs, but mining and plant operations have been temporarily paused pending a TAC Agreement.

Revenue
$55M
Gross margin · other
60%

Key metrics

shortened, hover for the filing’s print
MetricValueq/qy/y
Net revenuesother$55M––
Gross marginother60%––
Operating marginother32%––
EBITDA marginother47%––
Lithium oxide concentrate sales volumeother24,400t––
Lithium oxide concentrate productionother35,400t50% growth–
Realized price (SC5)otherUS$2,08917%–
Plant gate costsotherUS$ 401/t-36%–
CIF costsotherUS$452/t-33%–
Total Cash Costs (AISC - All-In Sustaining Cost)otherUS$668/t-6%–
Net debtother$125M––
Total debt declineother43% in two years––

Estimated 12 Month Period Plant 1; Estimated FY 2027 Plant 1; Estimated Plants 1 & 2; Estimated Plants 1, 2 & 3 outlook

  • NoteProduction volumes: 240,000; 330,000; 580,000; 830,000
  • NoteCIF China Cash Cost: ($452); ($452); ($452); ($452)
  • NoteAll-In Sustaining Cost: ($668); ($668); ($620); ($610)
  • NoteCash Flow @ US$1,500 /t: $200M; $275M; $510M; $739M
  • NoteCash Flow @ US$2,500/t: $440M; $605M; $1,090M; $1,569M
  • Note240,000t production of lithium oxide concentrate within 12 months
  • Note330,000 tonnes for the full year of 2027
  • Note580,000tpy by the end of 2027
  • Note830,000tpy by the end of 2028
  • NoteCompletion of the construction of its next industrial plant to the end of 2027
  • NoteInitiate construction of a third industrial plant next year, completing it by the end of 2028

What drove it

  • Net revenues were generated from the sale of 24,400t of lithium oxide concentrate.
  • Commercial flexibility improved the realized price by 17% to US$2,089 (SC5) from US$1,790 in 1Q 26.
  • The reduction in costs reflected a 50% growth in production volumes to 35,400t following the continuous ramp-up of operations started in January 2026.
  • The Company cited primarization of mining operations and upgrades in mining equipment as contributors to lower costs.
  • Productivity improvements in the reprocessing circuit from a steady flow of spodumene delivered to the industrial plant support the FY 2027 Plant 1 production guidance.

Concerns

  • Mining and plant operations have been temporarily paused since the week started July 17, 2026, pending closing of the TAC Agreement with the Minas Gerais state government.
  • The partial suspension followed notification from the Vale do Jequitinhonha regional branch of the Minas Gerais state environmental agency, including fines totaling approximately US$540,000.
  • The Company is evaluating financing alternatives for repayment of amounts outstanding under the export prepayment agreement with Synergy.
  • Completion of the next industrial plant was pushed forward to the end of 2027, primarily to reflect the recent temporary suspension of operations.
  • The Company states that lithium market prices may not remain at current levels.

What to watch

  • Conclusion of the TAC Agreement and the timing of resumed mining activities.
  • Continued sale of high-purity lithium fines from reprocessed tailings, which has continued without disruption.
  • Ramp-up of mining haulage capacity and the next phase of equipment upgrades after mining activities resume.
  • Financing negotiations for repayment of amounts outstanding under the Synergy export prepayment agreement.
  • Delivery of 240,000t of lithium oxide concentrate within 12 months and 330,000 tonnes for the full year of 2027.
  • Construction timing for Plants 2 and 3 and the targeted capacity expansion to 580,000tpy and 830,000tpy.

Balance sheet and cash flow

  • Net debt cut to US$125 million from US$134 million at the end of 1Q 26.
  • Sigma Lithium’s cash position stood at US$17 million as of June 30, 2026.
  • The Company continued to receive advanced payments from the previously announced US$96 million offtake agreement.
  • Amounts outstanding under the export prepayment agreement with Synergy totaled US$95 million as of June 30, 2026 (excluding $11 million cash held as collateral).
  • The Company agreed to the payment of up to US$540,000 for fines.
  • The Company estimates that proposed adjustments under the TAC Agreement will require estimated capex of approximately US$1,000,000.

Analysis

Sigma Lithium reported a record Q2 2026 on the measures disclosed in the release. Net revenues were US$55 million, compared with US$42 million in 1Q 26. Gross margin was 60%, compared with 61% in 1Q 26, while EBITDA margin increased to 47% from 39%. The Company also reported a 32% operating margin. Sales totaled 24,400t of lithium oxide concentrate, and the realized price increased 17% to US$2,089 (SC5) from US$1,790 in 1Q 26.

The operational ramp-up was the central cost driver. Production grew 50% to 35,400t, and the Company attributed lower costs to production growth, financial discipline, mining primarization and mining-equipment upgrades. Plant gate costs were US$ 401/t, down 36% from 1Q 26, while CIF costs were US$452/t, down 33%. Total Cash Costs of US$668/t, defined as AISC, were down 6% from 1Q 26.

Liquidity and debt reduction remain important. Net debt was US$125 million, down from US$134 million at the end of 1Q 26, and cash was US$17 million as of June 30, 2026. The Company continued receiving advanced payments under its previously announced US$96 million offtake agreement. Amounts outstanding under the Synergy export prepayment agreement totaled US$95 million as of June 30, 2026, excluding $11 million of cash held as collateral, and the Company is pursuing financing alternatives to enable a pre-payment.

The near-term operating outlook is constrained by the temporary partial suspension that began in the week started July 17, 2026. Mining and plant operations are paused while the Company negotiates a TAC Agreement with Minas Gerais state authorities, though sales of high-purity lithium fines from reprocessed tailings have continued. The Company agreed to payment of up to US$540,000 in fines and estimates approximately US$1,000,000 of capex for proposed procedural adjustments. The suspension led the Company to move its twelve-month 240,000t production guidance forward by a quarter and push completion of the next industrial plant to the end of 2027.

The longer-term production plan remains expansive. Sigma Lithium guides to 330,000 tonnes for full-year 2027 assuming Plant 1 operates throughout the year, with Plants 1 and 2 targeted for 580,000 tonnes and Plants 1, 2 and 3 targeted for 830,000 tonnes. The guidance table holds CIF China Cash Cost at ($452) across all periods and projects All-In Sustaining Cost declining from ($668) to ($620) and ($610) as additional plants are included. The immediate focus is the TAC conclusion, operational restart, financing for the Synergy balance and execution against the revised capacity timetable.

Not in the filing

stated, not guessed
  • Accounting basis under IFRS or local GAAP was not specified in the filing text.
  • GAAP and non-GAAP gross profit, operating income, EBITDA, net income and EPS were not reported.
  • Prior-year comparisons for net revenues, margins, sales volume, production, realized price and costs were not reported.
  • Prior-quarter production volume and prior-quarter values for plant gate costs, CIF costs and AISC were not reported.
  • Operating cash flow and free cash flow were not reported.
  • Total debt amount at June 30, 2026 was not reported.
  • Share repurchases, dividends and other capital-return activity were not reported.
  • Segment revenue disclosures were not reported.
  • Forward revenue, gross-margin, operating-expense and tax-rate guidance were not reported.
  • Named executive commentary and attributable executive quotes were not included.

Written by an AI language model from the company’s SEC earnings filing (Form 8-K Item 2.02, or Form 6-K for a foreign private issuer). Every figure is checked against the filing text, and a metric the filing does not print, or whose value, prior period and change do not add up, is dropped from the metrics. The model can still misread a table, in the metrics or in the text, so check a number in the filing before you rely on it. Consensus estimates, price targets and share-price reactions are not shown because they are not in the filing. AI-generated research, not investment advice.

Questions about SGML earnings dates

When is Sigma Lithium's next earnings date?
AlphAI has no date for SGML yet. We do not publish estimates, so this page shows a date the day we have one.
Why is there sometimes no date?
AlphAI leaves out estimates. Many sites fill the gap by adding about 91 days to the last report, but that arithmetic is a guess, and a wrong date costs a reader more than a missing one, so we show nothing until a date is set, and a company can still move it. Every quarter already on this page is read straight from the SEC filing: an 8-K item 2.02 for US filers, a 6-K earnings release for foreign private issuers.