Rio Tinto & Rondo Energy initiate engineering study for heat battery at Yarwun alumina refinery-Yieh Corp Steel News
Rio Tinto and Rondo Energy began engineering work to integrate a 30 MW heat battery at the Yarwun alumina refinery in Australia. The system, funded initially by A$3.6 million from the Australian Renewable Energy Agency, aims to reduce annual CO2 emissions by 67,000 tons if fully executed.
How this was made

The 30-second read
Why it matters
The initiative could reduce on‑site CO₂ emissions by ~67,000 tons annually, aligning with ESG goals and possibly attracting sustainability‑focused capital.
Market read
First‑report of a decarbonisation project at a major miner; modest but positive relevance for Rio Tinto and ESG‑oriented investors.
What to watch
Potential technical challenges of integrating high‑temperature heat storage into existing steam networks could delay benefits.
Background
Rio Tinto, a major global mining company, is partnering with Rondo Energy to explore a heat‑battery solution that stores off‑peak electricity as high‑temperature thermal energy for its alumina refinery.
Ticker impact
Rio Tinto began a front‑end engineering study to add a 30 MW/360 MWh heat battery at the Yarwun alumina refinery.
modest upside as the market prices in the decarbonisation initiative
While the funding commitment is modest and the project is early‑stage, Rio Tinto's size and ESG focus give the news a small bullish bias.
Market effects
Highlights growing interest in thermal energy storage for heavy‑industry decarbonisation, potentially encouraging similar projects in mining and aluminium sectors.
May slightly boost sentiment toward Australian industrial assets as the project receives Australian Renewable Energy Agency funding.
Adds to the broader narrative of large miners investing in low‑carbon technologies, but impact is limited to Rio Tinto and related ESG themes.
Counterpoint
The project is still in design phase with limited capital exposure; investors may view it as a non‑material cost with no near‑term earnings impact.
Key entities
- companyRio Tinto
Global mining group undertaking the heat‑battery project.
- companyRondo Energy
Thermal energy storage specialist collaborating on the engineering study.
- government_agencyAustralian Renewable Energy Agency
Provides initial A$3.6 million funding for design work.




