Purepoint Uranium and IsoEnergy approve 7,700-metre drill plan at Dorado
Purepoint Uranium (TSX-V:PTU, OTCQX:PTUUF) and IsoEnergy approved a 2027 exploration plan for their Dorado project in Saskatchewan, including 7,700 metres of drilling. The plan targets the Q24 and Nova areas, with drilling set for January-March 2027 and summer 2027, respectively. Purepoint CEO Chris Frostad highlighted the potential of the Q24 target. The Dorado Project is a 50/50 joint venture.







